Study online at https://quizlet.com/_h7rsfp
1. Software deteriorates due to... Changes that degrade the code structure, changes
that degrade the design, changes that potentially
incorporate more bugs
2. What are the two broader categories Generic products, customized products
of software products?
3. Which of the following is not a major Software testing
software process activity?
4. During the lectures, we have dis- Quality, process, methods, tools
cussed software engineering as a
four layered technology... which of
the following belongs to the four lay-
er technology?
5. Which of the following is the UML Astah
modeling tool that is required we use
in CSE360
6. According to the article "Software En- Small team size, predictable delivery dates, short
gineering not CS", material cost of schedule
other engineering products is about
50% compared to almost 100% labor
cost in software engineering. Due to
the huge labor cost, software projects
need to focus more on...
7. According to the article "Software En- Good maintainability, minimal defects, maintain a
gineering not CS", a well-run soft- cohesive team
ware project can be managed to meet
which of the following product goals?
, cse360 final review
Study online at https://quizlet.com/_h7rsfp
8. (T/F) Pair programming invented in False
XP promotes faster coding as two
people are programming the same
module
9. (T/F) User stories in XP are developed False
by project managers
10. (T/F) In XP, new versions may be built True
several times per day...
11. (T/F) Scrums are daily meetings in the True
scrum process model
12. Which of the following are software Specification, Design and implementation
main process activities?
13. Which of the following statements all of the process activities are planned in-advanced
is true about plan driven software and progress is measured against this plan, incre-
process models? mental process model is an example of a plan driven
approach
14. Consider the following software pro- Incremental process model
ject requirement and then select the
best process model to develop this
software...
A software firm has just signed a con-
tract to deliver an inventory track-
ing/on-line transaction system for
use by 500 entry clerks in the con-
tract. The client has demanded a
schedule of rigorous checkpoints in