Correct Answers (Guaranteed Pass)
What is a standard key used by watch standers and maintenance personnel? - answer-
Operator key
Who has the only keys to the key locker? - answer-Key issue control custodian,
Engineering duty officer, and the Engineering officer
Who must any breach of security procedures be reported to? - answer-The Engineering
officer
Who can approve the resumption of normal operations? - answer-Engineer officer, CDO,
or CO
Who is responsible for physical security of the ship and takes direct control of security
forces in the event of a security alert? - answer-CDO
In-port, represents the CO, and reports to the CDO - answer-OOD
Who controls access to the ship and receives hourly reports from the sounding and
security watch? - answer-
OOD
In cases involving fire or flooding, what information do you state? - answer-Type of
casualty, location, compartment noun name, your name, rate/rank and telephone
number
What is the purpose of the EOSS? - answer-Provides safe, accurate and standardized
procedures tailored to each ship
What does EOSS stand for? - answer-Engineering Operational Sequencing System
The use of the EOSS is? - answer-Mandatory
Changes in the EOSS must be authorized by? - answer-CO
What are the 3 parts of the EOSS? - answer-User Guide, Engineering Operational
Procedures(EOP), Engineering Operational Casualty Control(EOCC)
, Where is the EOSS located? - answer-In the Engineering Spaces. There is also a
CD-
ROM kept in the log room
Master Plant Procedures are structured so that they are the overall controlling
document
used by? - answer-The
EOOW
What provides proper valve alignment for each combination of tanks, components, fuel
stations, and systems that are used when accomplishing an evolution? - answer-Tank
Table
What provides tank capacities? - answer-Tank Status Diagrams
The act of opening an electrical circuit breaker or switch at a power supply - answer-De-
energize
The act of closing an electrical circuit breaker or switch at a power supply - answer-
Energize
The opening or shutting of valves in a piping system or the positioning of switches or
controls in an electrical system to permit the required flow of fluids or current -
answerAlign
What is the recommended minimum actions that must be completed prior to plant start-
up? - answer-The Master Pre-light off check list (MLOC)
What are the 4 actions of the EOCC? - answer-Controlling, Immediate, Supplemantary
and Restoring
What 2 actions of the EOCC must be memorized? - answer-Controlling and Immediate
Watch station actions that are taken to bring the plant to a safe and stable operation
condition - answer-Supplementary
actions
Actions taken to stop spread of casualty and minimize plant losses - answer-Immediate
actions
How many parts per million of oil is sufficient enough to cause a sheen? - answer-15-20
Why do you need to remove any oil from the bilges? - answer-It may generate vapors
that can ignite with spark or open flame
In accordance with Navy policy, sewage cannot be discharged how many miles from