Latest Update 2025-2026 150 Questions and
100% Verified Correct Answers Guaranteed A+
13a.) (T/F) When evaluating quotes, the total amount of the basic order and all the
options are considered.
a.) True
b.) False - CORRECT ANSWER: a.) True
13a.) (T/F) When fashioning suitable evaluation procedures to fulfill requirements
through SAP, CO's may use procedures in FAR Parts 13 and 15.
a.) True
b.) False - CORRECT ANSWER: b.) False. COs may use the procedures outlined in
FAR Parts 14 and 15.
13a.) (T/F) When using SAP, factors should be listed in order of importance to allow for
competitive quotes, bids, proposals.
a.) True
b.) False - CORRECT ANSWER: b.) False. When using SAP, evaluation factors do not
have to be listed in any particular order and may be developed without identifying the
importance of these factors when compared to one-another.
13a.) According to FAR 13.106-2 the CO shall evaluate quotations or offers:
a.) In an impartial manner
b.) Inclusive of transportation costs.
c.) Based solely on lowest price
d.) a & b
e.) All of the above - CORRECT ANSWER: d. In an impartial manner, and inclusive of
transportation costs.
,13a.) Define Past Performance - CORRECT ANSWER: A past performance evaluation
is an assessment of the offeror's probability of meeting the schedule and performance
requirements of the acquisition.
13a.) FAR 14.201-8(c) states the government should consider the advantages and
disadvantages associated with making more than one __________________.
a.) Solicitation
b.) Option
c.) Award
d.) Evaluation - CORRECT ANSWER: c.) Award
13a.) How should a CO evaluate quotations or offers? - CORRECT ANSWER: In an
impartial manner, and inclusive of transportation costs.
13a.) No matter what your evaluation factors or procedures are:
a.) Price is the most crucial element
b.) Only 3-5 quotations can be evaluated at a time
c.) All quotations submitted shall be considered
d.) None of the above
e.) All except d. - CORRECT ANSWER: c. All quotations submitted shall be considered
13a.) Once evaluation factors have been determined, applying them to evaluate
quotations is known as using... - CORRECT ANSWER: Evaluation procedures
13a.) Quotations shall be evaluated on the basis established in the solicitation against
"________________" using "________________" - CORRECT ANSWER: "evaluation
factors" & "evaluation procedures"
, 13a.) Sealed bidding can only use which factors? - CORRECT ANSWER: Price related
factors
13a.) The CO shall assume, for the purpose of making multiple awards, that
_________________ would be the administrative cost for the processing of each
award.
a.) $50
b.) $100
c.) $500
d.) $1,000 - CORRECT ANSWER: c.) $500
13a.) The technical evaluation factor reflects the degree to which the offered approach
meets or does not meet the minimum __________________ or ________________
requirements. - CORRECT ANSWER: performance, capability
13a.) The two basic categories of evaluation factors are ________________ and
_________________ - CORRECT ANSWER: "price related" and "non-price related"
13a.) Under SAP are you required to build a formal data base to score quotes?
a.) Yes
b.) No - CORRECT ANSWER: b.) No. Under SAP there is no requirement to build a
formal data base to score quotes.
13a.) What are evaluation factors? - CORRECT ANSWER: The items you identify as
most important in a quotation.
13a.) What is the difference between F.O.B Destination and F.O.B origin? - CORRECT
ANSWER: Free On Board (F.O.B) Destination is when the seller or vendor is
responsible for goods until they are delivered to the point of destination.
F.O.B Origin is where the seller or vendor is responsible for goods until they get
shipped. Customer is liable for damage in transit beyond that point.