Actual Exam Questions With Reviewed
100% Correct Detailed Answers
Guaranteed Pass!!Current Update
(Verified A+ Pass)
1) Industrial facilities are identified in the federal storm water regulations by
_________________________________________ and narrative description -
ANSWER Standard Industrial Classification (SIC) Code
2) The surface water that receives the point source discharge is called the
________________________________. This information must be included on
the Notice of Intent (NOI) application when applying for the storm water
discharge coverage - ANSWER Receiving Waters
3) Surface waters of the state include __________________, ____________,
________________, and ___________________________. - ANSWER Rivers
Lakes
Streams
Wetlands
4) A ___________________________________ is any discernible, confined,
,and discrete conveyance that discharges storm water into surface waters.
Examples include, but are not limited to, pipes, ditches, channels, tunnels,
conduits, conduits, or anything that conveys storm water into surface waters. -
ANSWER Point Source Discharge
5) A discharge point that directs waste water, including storm water to a storm
sewer is called a/an _________________________. - ANSWER Point of
Discharge
6) A discharge point that directs waste water, including storm water to surface
waters of the state is called a/an ___________________________
_____________________. - ANSWER Outfall
7) A sewer system in which the storm water is kept separate from sanitary
sewage and discharges directly into a surface water body is called a ________
_____________________________________________. - ANSWER Separate
Storm Sewer System
8) A sewer system in which the sanitary sewage and the storm water are
combined and are directed to a wastewater treatment plant is called a _______
_____________________________________________. - ANSWER Combined
Sewer System
9) For industrial facilities that are regulated by the federal regulations and
, there is a point source discharge, but there is no exposure of industrial
materials, the no exposure certification must be submitted every __________
in MiWaters - ANSWER 5 years
10) The application for storm water permit coverage must be signed by the
__________________________________________________________ - ANSWER
Principal executive officer or designee
11) ___________________________ is a state-of-the-art, comprehensive,
web-based permitting and compliance database. - ANSWER MiWaters
12) The focus of MiWaters is ________________ and _________________. -
ANSWER Permitting and compliance
13) List the 5 Notice of Intent (NOI) requirements that are certified by the
signature on the Notice of Intent.. - ANSWER A Storm Water Pollution
Prevention Plan (SWPPP) has been developed for the facility.
The facility has an industrial storm water certified operator.
There are no unauthorized discharges from the facility.
Nonstructural Controls have been implemented.
Structural Controls are in place or will be in place according to the dates in the
SWPPP.
14) Certain types of forms and reports, particularly those administered under