1. What agency does DoD typically delegate contract administrative
responsibilities for supply contracts? - ANSWER Defense Contract
Management Agency
2. A purpose of a postaward orientation is to: - ANSWER Achieve a clear
and mutual understanding of all contract requirements
3. A contractor employee accidentally broke a test fixture that belongs to the
Government and is accountable to a Government contract. Generally
speaking: - ANSWER Contractors are not held liable for loss of
Government property
4. According to the FAR, the acquisition team: - ANSWER Includes the
contractor
5. With limited exceptions, a Contractor Performance Assessment Reporting
System (CPARS) report is required: - ANSWER When the contract dollar
value exceeds the simplified acquisition threshold
,6. To be determined responsible by a contracting officer, a prospective
contractor must: - ANSWER Have adequate financial resources to
perform the contract, or the ability to obtain them
7. In ensuring overall quality of items and services received under a contract,
which of the following is the responsibility of the Government? - ANSWER
Quality assurance surveillance
8. The Government's preferred remedy to nonconforming goods or services is:
- ANSWER Allow the contractor to repair or replace the nonconforming
items, as long as there is still time left within the required delivery schedule.
9. Quality assurance policies and procedures found in FAR part 46: - ANSWER
Apply to both the Government and contractor
10.Contractors are responsible for: - ANSWER Tendering to the
Government for acceptance only those supplies or services that conform to
contract quality requirements
11.Does the Government have the right to inspect a product before it is
accepted? - ANSWER Yes, always.
12.When does title for a completed product transfer to the Government,
assuming the product meets all contract requirements? - ANSWER
Upon formal acceptance by the Government
, 13.In commercial contracting, what quality system is utilized? - ANSWER
The contractor's
14.According to the FAR, acceptance of supplies or services is the responsibility
of whom? - ANSWER The contracting officer
15.When preparing a solicitation, the quality requirements essential to ensure
the integrity of the supplies or services is developed by whom? - ANSWER
The activity responsible for technical requirements
16.Quality assurance on contract actions valued below the simplified
acquisition threshold (SAT) is: - ANSWER Minimal, unless a special
circumstance exists
17.Which of the following statements regarding Small Business Subcontracting
Plans is accurate? - ANSWER Not required for contracts with large
businesses performed overseas
18.Does the Government's policy to require prime contractors to incorporate,
to the maximum extent practicable, commercial items or
nondevelopmental items as components of items supplied to the agency,
apply to subcontractors at all levels? - ANSWER Yes.
19.Which of the following entities has privity with a first-tier subcontractor? -
ANSWER The prime contractor