Class 200 final Exam 80 Questions and Answers. @i @i @i @i @i @i @i
____________ ____________ should not be disassembled in the field - @i @i @i @i @i @i @i @i @i @i
@i ✔️Oil buffers
@i @i
Two safety precautions to be followed when first entering the elevator pit are to have the ___________ _
@i @i @i @i @i @i @i @i @i @i @i @i @i @i @i @i @i
__________ ___________open and the pit light on. - @i @i @i @i @i @i @i @i
@i ✔️Pit stop switch
@i @i @i
Tension on the governor rope is maintained by using a - @i @i @i @i @i @i @i @i @i @i @i
@i ✔️Tension sheave
@i @i
The ASME Safety Code requires oil buffers for elevators when traveling at a car speed of -
@i @i @i @i @i @i @i @i @i @i @i @i @i @i @i @i @i
@i ✔️Over 200 FPM
@i @i @i
If the pit extends more than ______ feet below the sill of the access door, a fixed vertical ladder shall be lo
@i @i @i @i @i @i @i @i @i @i @i @i @i @i @i @i @i @i @i @i @i
cated within reach of the access door. -
@i @i @i @i @i @i @i @i
@i ✔️3 @i
If using a rope fall with 4 sheaves to lift 500 lbs. how much pulling force will be required?
@i @i @i @i @i @i @i @i @i @i @i @i @i @i @i @i @i @i
Add 10% to the weight of the load for each sheave. -
@i @i @i @i @i @i @i @i @i @i @i @i @i
@i ✔️175 lbs. @i @i
OSHA requires that slings used for hoisting be inspected at what intervals? -
@i @i @i @i @i @i @i @i @i @i @i @i @i
@i ✔️Each day before using
@i @i @i @i
Spring buffers are used only when the elevator travels at ___________ FPM or less. -
@i @i @i @i @i @i @i @i @i @i @i @i @i @i @i
@i ✔️200 @i
All measurements necessary for the installation of various components in the pit are measured with refer
@i @i @i @i @i @i @i @i @i @i @i @i @i @i @i
ence to the - @i @i @i @i
@i ✔️guide rails
@i @i
, ASME Safety Code requires that a fully compressed oil buffer should return to its normal position within _
@i @i @i @i @i @i @i @i @i @i @i @i @i @i @i @i @i
________ seconds after the elevator car or counterweight has been removed. -
@i @i @i @i @i @i @i @i @i @i @i @i
@i ✔️90
@i
Wood used to construct a hoisting support must be -
@i @i @i @i @i @i @i @i @i @i
@i ✔️scaffold grade
@i @i
What is a sign of poor quality manila rope? -
@i @i @i @i @i @i @i @i @i @i
@i ✔️Dark colored fibers
@i @i @i
(True/False) All synthetics are impervious to sunlight. - @i @i @i @i @i @i @i @i
@i ✔️False
@i
(True/False) Good quality manila rope has a light yellow color with a silvery or pearly luster. -
@i @i @i @i @i @i @i @i @i @i @i @i @i @i @i @i @i
@i ✔️True
@i
What is the minimum number and proper spacing of crosby clips for rope diameters from 1/2 to 3/4. -
@i @i @i @i @i @i @i @i @i @i @i @i @i @i @i @i @i @i @i
@i ✔️3 crosby clips 6 times the rope diameter apart
@i @i @i @i @i @i @i @i @i
The cutting force is applied on the (forward/return) stroke when using a hacksaw. -
@i @i @i @i @i @i @i @i @i @i @i @i @i @i
@i ✔️forward
@i
What type of lumber must be used for decking on scaffolding? -
@i @i @i @i @i @i @i @i @i @i @i @i
@i ✔️Scaffold grade
@i @i
Glass must be either ____________ or ____________ to hold the glass together if broken. -
@i @i @i @i @i @i @i @i @i @i @i @i @i @i @i
@i ✔️Laminated, Bonded
@i @i
What is the required height of an OSHA approved barricade? -
@i @i @i @i @i @i @i @i @i @i @i
@i ✔️42"
@i
____________ ____________ should not be disassembled in the field - @i @i @i @i @i @i @i @i @i @i
@i ✔️Oil buffers
@i @i
Two safety precautions to be followed when first entering the elevator pit are to have the ___________ _
@i @i @i @i @i @i @i @i @i @i @i @i @i @i @i @i @i
__________ ___________open and the pit light on. - @i @i @i @i @i @i @i @i
@i ✔️Pit stop switch
@i @i @i
Tension on the governor rope is maintained by using a - @i @i @i @i @i @i @i @i @i @i @i
@i ✔️Tension sheave
@i @i
The ASME Safety Code requires oil buffers for elevators when traveling at a car speed of -
@i @i @i @i @i @i @i @i @i @i @i @i @i @i @i @i @i
@i ✔️Over 200 FPM
@i @i @i
If the pit extends more than ______ feet below the sill of the access door, a fixed vertical ladder shall be lo
@i @i @i @i @i @i @i @i @i @i @i @i @i @i @i @i @i @i @i @i @i
cated within reach of the access door. -
@i @i @i @i @i @i @i @i
@i ✔️3 @i
If using a rope fall with 4 sheaves to lift 500 lbs. how much pulling force will be required?
@i @i @i @i @i @i @i @i @i @i @i @i @i @i @i @i @i @i
Add 10% to the weight of the load for each sheave. -
@i @i @i @i @i @i @i @i @i @i @i @i @i
@i ✔️175 lbs. @i @i
OSHA requires that slings used for hoisting be inspected at what intervals? -
@i @i @i @i @i @i @i @i @i @i @i @i @i
@i ✔️Each day before using
@i @i @i @i
Spring buffers are used only when the elevator travels at ___________ FPM or less. -
@i @i @i @i @i @i @i @i @i @i @i @i @i @i @i
@i ✔️200 @i
All measurements necessary for the installation of various components in the pit are measured with refer
@i @i @i @i @i @i @i @i @i @i @i @i @i @i @i
ence to the - @i @i @i @i
@i ✔️guide rails
@i @i
, ASME Safety Code requires that a fully compressed oil buffer should return to its normal position within _
@i @i @i @i @i @i @i @i @i @i @i @i @i @i @i @i @i
________ seconds after the elevator car or counterweight has been removed. -
@i @i @i @i @i @i @i @i @i @i @i @i
@i ✔️90
@i
Wood used to construct a hoisting support must be -
@i @i @i @i @i @i @i @i @i @i
@i ✔️scaffold grade
@i @i
What is a sign of poor quality manila rope? -
@i @i @i @i @i @i @i @i @i @i
@i ✔️Dark colored fibers
@i @i @i
(True/False) All synthetics are impervious to sunlight. - @i @i @i @i @i @i @i @i
@i ✔️False
@i
(True/False) Good quality manila rope has a light yellow color with a silvery or pearly luster. -
@i @i @i @i @i @i @i @i @i @i @i @i @i @i @i @i @i
@i ✔️True
@i
What is the minimum number and proper spacing of crosby clips for rope diameters from 1/2 to 3/4. -
@i @i @i @i @i @i @i @i @i @i @i @i @i @i @i @i @i @i @i
@i ✔️3 crosby clips 6 times the rope diameter apart
@i @i @i @i @i @i @i @i @i
The cutting force is applied on the (forward/return) stroke when using a hacksaw. -
@i @i @i @i @i @i @i @i @i @i @i @i @i @i
@i ✔️forward
@i
What type of lumber must be used for decking on scaffolding? -
@i @i @i @i @i @i @i @i @i @i @i @i
@i ✔️Scaffold grade
@i @i
Glass must be either ____________ or ____________ to hold the glass together if broken. -
@i @i @i @i @i @i @i @i @i @i @i @i @i @i @i
@i ✔️Laminated, Bonded
@i @i
What is the required height of an OSHA approved barricade? -
@i @i @i @i @i @i @i @i @i @i @i
@i ✔️42"
@i