Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

ACI- CONCRETE FIELD-TESTING TECHNICIAN - GRADE 1 FINAL EXAM AND PRACTICE EXAM QUESTIONS 2025 NEWEST ACTUAL EXAM COMPLETE EXAM QUESTIONS WITH DETAILED VERIFIED ANSWERS _ALREADY GRADED A+ .pdf

Rating
-
Sold
-
Pages
16
Grade
A+
Uploaded on
23-05-2025
Written in
2024/2025

ACI- CONCRETE FIELD-TESTING TECHNICIAN - GRADE 1 FINAL EXAM AND PRACTICE EXAM QUESTIONS 2025 NEWEST ACTUAL EXAM COMPLETE EXAM QUESTIONS WITH DETAILED VERIFIED ANSWERS _ALREADY GRADED A+ .pdf

Institution
ACI- CONCRETE FIELD-TESTING TECHNICIAN -
Course
ACI- CONCRETE FIELD-TESTING TECHNICIAN -

Content preview

Science Engineering Chemical Engineering




ACI- CONCRETE FIELD-TESTING
TECHNICIAN - GRADE 1 FINAL EXAM AND
PRACTICE EXAM QUESTIONS 2025 NEWEST
ACTUAL EXAM COMPLETE EXAM QUESTIONS
WITH DETAILED VERIFIED ANSWERS
/ALREADY GRADED A+
Save




Students also studied




Diabetes NCLEX Questions Building Construction Final Exam ASE P2 Practice Quiz


Teacher 133 terms 133 terms Teacher 123 terms




Catherine_wanjiru89 Preview Titus_Kiilu9 Preview Nancy_Mukami8




Q1. Start molding specimens for B. False

strength tests within 30 minutes

after fabricating the composite ASTM C172 -Para (4.1.2) - Start molding.

sample. specimens for strength tests within 15 min after fabricating the

composite sample.

A. True

B. False


Q2. The maximum allowable B. False

time between obtaining the first

and last portions of the ASTM C172 - Para (4.1)- The elapsed time shall not exceed 15 min.

composite sample may not between obtaining the first and final portions of the composite

exceed 5 minutes. sample.



A. True

B. False


Q3. The composite concrete A. True

sample must be protected from

sun, wind, contamination and ASTM C172 - Para (4.1.2)

rapid evaporation.



A. True

B. False

,Q4. If the concrete contains A. True

aggregates larger than those

that are appropriate for a size of ASTM C172- Para (6.1)

mold or equipment used, the

sample should be wet sieved

before making the test.



A. True

B. False


Q5. The composite sample B. False

should not be remixed before

beginning any tests. ASTM C172-Para (4.1.1) -The sample shall be combined and

remixed with a shovel the minimum amount necessary to ensure

A. True uniformity and compliance with the maximum time limits

B. False


B. False

Q6. Sampling should normally

be performed, as the concrete is ASTM C172-Para (5). NOTE 2—Sampling should normally be

discharged from the mixer. performed as the concrete is delivered from the mixer.



A. True To the conveying vehicle used to transport the

B. False concrete to the forms; however, specifications may require other

points of sampling, such as the discharge of a concrete pump.


Q7. ASTM Method C172 includes A. True

sampling from stationary mixers,

paving mixers, truck mixers, ASTM C172- Para (1.1)

agitators, and non-agitating

equipment.



A. True

B. False


Q8. After sampling is D. None of the above

completed, start the tests for

slump and air content within: ASTM C172- Para (4.1.2) Start tests for slump, temperature, and air

content within 5 min after obtaining the final portion of the

A. 2 ½ minutes composite sample.

B. 10 minutes

C. 15 minutes

D. None of the above


Q9. In any case, do not obtain A. All the water and admixtures have been added to the

samples until: concrete.



A. All the water and admixtures ASTM C172- Para (5.2.3). In any case do not obtain samples until

have been added to the after all of the water has been added to the mixer.

concrete

B. 200 revolutions of the drum

have been obtained

C. ½ of the water has been

added

D. None of the above

, A. 10% or after 90%


Q10. No samples shall be taken
ASTM C172- Para (5.2.1).
before_________ or after_________ of

the batch has been discharged.
NOTE 3—No samples should be taken before 10 % or after 90 %

of the batch has been discharged.
A. 10% or after 90%

B. 20% or after 90%
Due to the difficulty of determining the actual quantity of
C. 20% or after 80%
concrete discharged, the intent is to provide samples that are
D. None of the above
representative of widely separated portions, but not the

beginning and the end of the load.


Q11. When strength tests are to B. 1 cubic foot

be made, the minimum size of

the composite sample shall be: ASTM C172- Para (5.1).



A. ¼ cubic foot Make the samples to be used for strength tests a minimum of 28

B. 1 cubic foot L (1 ft3).

C. Any convenient size

D. 1 Wheelbarrow


Q12. Sample the concrete from B.

the chute of a truck mixer by:

Passing a receptacle completely through the discharge steam or

A. Raising chute to stop the flow by completely diverting the discharge into the sample container.

and scoop concrete from there

into the slump cone and ASTM C172- Para (5.2.3).

cylinder molds

B. Passing a receptacle

completely through the

discharge steam or by

completely diverting the

discharge into the sample

container

C. Holding a shovel in the flow

and direct half into a bucket

D. None of the above


Q13. Fresh concrete to be tested C. Two or more regularly spaced intervals during discharge of

at the job site should be the middle portion of the batch

sampled from:

ASTM C172- Para (5.2.1).

A. The beginning of mixer

discharge

B. The last concrete discharged

C. Two or more regularly spaced

intervals during discharge of the

middle portion of the batch

D. All of the above

Written for

Institution
ACI- CONCRETE FIELD-TESTING TECHNICIAN -
Course
ACI- CONCRETE FIELD-TESTING TECHNICIAN -

Document information

Uploaded on
May 23, 2025
Number of pages
16
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$18.49
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Educator001 Johns Hopkins University School Of Medicine
Follow You need to be logged in order to follow users or courses
Sold
67
Member since
2 year
Number of followers
46
Documents
1334
Last sold
1 month ago
Hope is enough.

Hi, Worry no more. You can now access easily reliable, highly rated exam and learning materials directly from our stuvia page. We offer exams in Medical course , Nursing courses , Insurance ,Maternal newborn, Pediatric, NCLEX, Med surg, Hesi, Testbanks. Use search icon below to find your intended document among. You can contact me if you need any assistance on any exam, free samples, free advice, better preview etc. Thank you and Success in your studies.

Read more Read less
4.8

259 reviews

5
225
4
20
3
6
2
3
1
5

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions