Chesapeake Bay Preservation Areas that result in a land disturbance greater
than or equal to ____ and less than ____
Choose matching definition
1 5,000 ft^2, 3 acres 2 1,000 ft^2, 2 acres
3 10,000 ft^2, 0.5 acres 4 2,500 ft^2, 1 acre
Don't know?
The Virginia Stormwater Virginia Stormwater Management Act, Virginia Stormwater
Management Program is Management Program Regulation
authorized by the ______ and
administered through the ______
, VPDES Permit/Construction GP greater than or equal to an acre
authorizes discharge of
stormwater from construction
activities that are
The Stormwater Management permit, regulate, and control stormwater runoff
Act requires the State Water
Control Board to
DEQ has ___ days to complete 90
review of real or potential inter-
jurisdictional impacts upon
request
The Stormwater Management staff of a stormwater program, anyone contracted by a VSMP
Act requires the following authority, standard and specification holders
individuals to obtain and
maintain a certificate of
competency
The dual certificate will expire the latest date of the certificates
three years from
SWM plan must be approved by VSMP program authority
___ before land disturbance
The water quality criteria sets a 0.41 lbs/acre/year
site-based load limit of ____ of
total phosphorus for new
development
The phosphorus load limit uses 10% impervious cover
the
Part II B and II C water quantity channel protection and flood protection
criteria addresses
Which two plans in the SWPPP SWM plan, ESC plan
must be approved?
Does the SWM plan address post-construction
runoff during or after
construction?
What is the lower limit of the 10%
range of imperviousness that
can result in stream
degradation?
What do land disturbing excavating, clearing, grading
activities consist of?
LDA threshold for the SWM Act 1 acre or 2500 square feet for Chesapeake Bay Preservation Act
and Regulation
In situations where an initial 7 days of commencing the LDA and shall submit a permit
exemption was applicable application within 30 days of starting the land-disturbing activity
because LDAs were related to
emergency work, VSMP
authority shall be advised of the
disturbance within
Localities with MS4 must adopt and administer a stormwater program