,Terms in this set (80)
removal of all decommission
materials and
equipment, such
as medical
supplies,
hospital linens,
instruments, and
furniture, when
remodeling an
existing interior
space; formal
process to
remove
something from
active status
removal or decontamination
neutralization of
a hazardous
material
, isolated area decontamination unit
consisting of two
or more
chambers
constructed to
separate the
contained work
area from the
clean patient-
occupied area
object that demarcation
indicates a
boundary or a
separation
path of travel designated route
designed to
allow
construction
materials and
personnel to
move to or from
an area
questions and verified answers (
detailed & elaborated) ACTUAL
EXAM 2025 TEST!!
Save
Get a taste for our practice questions
Learn
Studied 7 terms
Nice work, you're crushing it
Continue studying in Learn
,Terms in this set (80)
removal of all decommission
materials and
equipment, such
as medical
supplies,
hospital linens,
instruments, and
furniture, when
remodeling an
existing interior
space; formal
process to
remove
something from
active status
removal or decontamination
neutralization of
a hazardous
material
, isolated area decontamination unit
consisting of two
or more
chambers
constructed to
separate the
contained work
area from the
clean patient-
occupied area
object that demarcation
indicates a
boundary or a
separation
path of travel designated route
designed to
allow
construction
materials and
personnel to
move to or from
an area