PJM 5900 Final Exam Questions and Answers Spring 2025 Northeastern University

Beoordeling
-
Verkocht
-
Pagina's
24
Cijfer
A+
Geüpload op
26-05-2025
Geschreven in
2024/2025

PJM 5900 Final Exam Questions and Answers Spring 2025 Northeastern University/PJM 5900 Final Exam Questions and Answers Spring 2025 Northeastern University

Instelling
PJM5900
Vak
PJM5900

Voorbeeld van de inhoud

12/11/23, 1:39 PM Elisha Nakka (She/Her)'s quiz history: PJM5900_Final Exam


PJM5900_Final Exam results for Elisha Nakka
(She/Her)
Score for this quiz: 60 out of 60
Submitted 29 Jun at 12:57
This attempt took 63 minutes.

pts
Question 1


Project task E has the following estimates: (1) optimistic time = 10 days,
(2) Pessimistic time = 20 days, and (3) Most likely time = 12 Days. The
expected time using the beta statistical distribution is __________ days.




Your answer:

13 DAYS( Thirteen days)




pts
Question 2


Tim is planning the budget for his project with the team. He tells them that it's
likely that the majority of the money will be spent during which of the following
processes?


Perform Integrated Change Control


Monitor and Control Project Work

Correct!
Direct and Manage Project Execution


Verify Scope



https://northeastern.instructure.com/courses/139932/quizzes/497722/history?version=1 1/24

,12/11/23, 1:39 PM Elisha Nakka (She/Her)'s quiz history: PJM5900_Final Exam




Correct! Direct and Manage Project Execution is the process of
performing the work defined in the project management plan to
achieve the project’s objectives. Thus, this is the process in which
costs (e.g., material and labor costs) are incurred.



pts
Question 3


All of the following statements are true except for which one?



A project may or may not be part of a program



Project life cycles are collections of sequential and occasionally
overlapping project phases.



Correct! Portfolios are collections of interdependent projects or programs


Programs are groups of related projects




Correct! A project Portfolio is a collection of projects or programs and
other work that are grouped together to facilitate effective management of
that work to meet strategic business objectives. The projects or programs of
the portfolio may not necessarily be interdependent or directly related.




pts
Question 4


Open the attached file to answer this question. Remember to close the
file before moving to the next question. The attached network diagram
would be best described as:Q_49_ND.pdf


https://northeastern.instructure.com/courses/139932/quizzes/497722/history?version=1 2/24

, 12/11/23, 1:39 PM Elisha Nakka (She/Her)'s quiz history: PJM5900_Final Exam

(https://northeastern.instructure.com/assessment_questions/332142/files/540657/download?
verifier=82oe3oKikkvt0tyimPpgcsOcbuWf29ORbYax1ECV&wrap=1)




Correct! AOA diagram


AON diagram


PDM diagram


AAO diagram




Correct! This diagram shows an activity on arrow network in which
the activities are shown on the arrows and the (circular) nodes
represent events.



pts
Question 5


A major output and deliverable from the project start-up and planning
phase that contains the best estimate of a project’s scope, benefits, costs,
risks, and resource requirements defines the:




Information Systems Plan


Statement of Work

Correct! Baseline Project Plan


Mission Statement




https://northeastern.instructure.com/courses/139932/quizzes/497722/history?version=1 3/24

Geschreven voor

Instelling
PJM5900
Vak
PJM5900

Documentinformatie

Geüpload op
26 mei 2025
Aantal pagina's
24
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$26.49
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
Millenialnurse Freelance Tutor
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
251
Lid sinds
4 jaar
Aantal volgers
147
Documenten
1482
Laatst verkocht
1 week geleden
Genuine Study Guides 2024

Holla me for assistance 24/7.

3.4

37 beoordelingen

5
17
4
4
3
4
2
2
1
10

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen