1. Takeoffs of conduit are categorized into ______. - CORRECT-
ANSWERSPower distribution, branch lighting, and branch power
2. Raceways are taken off per _____. Fittings required to make turns and
extensions are taking off per _____. - CORRECT-ANSWERSLinear foot, each
3. All wires and conductors are taken off per _____. - CORRECT-
ANSWERSLinear foot
4. All fittings, devices and boxes are taken off per _____. - CORRECT-
ANSWERSEach Item
5. Permits and fees for tie-ins may be listed at lump sum and are taken off
per _____. - CORRECT-ANSWERSOccurrence,Project, and Contract
6. Control stations are taken off by _______. - CORRECT-ANSWERSIndividual
Unit and Each Item.
7. Panelboards are taken off individually according to ______. - CORRECT-
ANSWERSType, Size, and Voltage
8. Starters, safety switches and fuses are taken off per _______. - CORRECT-
ANSWERSEach Item
9. _______ should be kept separate from general light fixtures. - CORRECT-
ANSWERSExit Lighting
,10. Interior and exterior lighting should be taken off and listed _______. -
CORRECT-ANSWERSSeparately
11. Lamps for light fixtures are _______. - CORRECT-ANSWERSTaken off per
each Item
12. Light fixtures should be listed in the takeoff according to _______. -
CORRECT-ANSWERSColor
13. Working electrical drawings numbered sequentially, prefaced by the
letter "E", include _______. - CORRECT-ANSWERSTelecommunications and
security systems only
14. The _______ shows power requirements of the structure. - CORRECT-
ANSWERSPower plan
15. The _______ aids the electrical contractor sizing the panel. - CORRECT-
ANSWERSPanel Schedule
16. The _______ plan is supplemented by the fixture schedule. - CORRECT-
ANSWERSLighting
17. The fixture schedule lists lamp _______. - CORRECT-ANSWERSWattage
18. Electrical specifications provide _______. - CORRECT-ANSWERSThe grade
of materials to be used, Materials installation specifics, and how materials
will be used in the finished system
19. _______ must be maintained by the electrical contractor for all installed
work. - CORRECT-ANSWERSAs-built drawings
20. No conductors are smaller than No. _______ wire. - CORRECT-ANSWERS12
, 21. _______ Shall be installed in service entrances and panel feeders. -
CORRECT-ANSWERSRigid conduit
22. The electrical contractor is responsible for providing and installing _______
for a complete telephone system. - CORRECT-ANSWERSOutlet boxes, pull
boxes, and empty raceways
23. Interpretation of construction drawings and specifications may conflict
when _______. - CORRECT-ANSWERSStandard specifications are used with
specific working plans, previously prepared plans are changed and
referenced in the specifications only, and when previously prepared drawings
are amended but not noted on all file drawings
24. Site preparation information is provided on the _______ plan. - CORRECT-
ANSWERSSite
25. The electrical contractor is responsible for all site _______. - CORRECT-
ANSWERSExcavation, surface repair, and pumping
26. To avoid incurring additional costs due to broken lines, underground
wires and utilities must be located _______. - CORRECT-ANSWERSBefore
digging
27. Electrical drawings must be reviewed for existing, or required,
installations of features ______. - CORRECT-ANSWERSUnder the slab-on-grade
and in the basement
28. The electrical contractor is responsible for all costs associated with
_______ where any electrical items were not installed - CORRECT-
ANSWERS28. Cutting and patching only
CORRECT QUESTIONS AND ANSWER
2025
1. Takeoffs of conduit are categorized into ______. - CORRECT-
ANSWERSPower distribution, branch lighting, and branch power
2. Raceways are taken off per _____. Fittings required to make turns and
extensions are taking off per _____. - CORRECT-ANSWERSLinear foot, each
3. All wires and conductors are taken off per _____. - CORRECT-
ANSWERSLinear foot
4. All fittings, devices and boxes are taken off per _____. - CORRECT-
ANSWERSEach Item
5. Permits and fees for tie-ins may be listed at lump sum and are taken off
per _____. - CORRECT-ANSWERSOccurrence,Project, and Contract
6. Control stations are taken off by _______. - CORRECT-ANSWERSIndividual
Unit and Each Item.
7. Panelboards are taken off individually according to ______. - CORRECT-
ANSWERSType, Size, and Voltage
8. Starters, safety switches and fuses are taken off per _______. - CORRECT-
ANSWERSEach Item
9. _______ should be kept separate from general light fixtures. - CORRECT-
ANSWERSExit Lighting
,10. Interior and exterior lighting should be taken off and listed _______. -
CORRECT-ANSWERSSeparately
11. Lamps for light fixtures are _______. - CORRECT-ANSWERSTaken off per
each Item
12. Light fixtures should be listed in the takeoff according to _______. -
CORRECT-ANSWERSColor
13. Working electrical drawings numbered sequentially, prefaced by the
letter "E", include _______. - CORRECT-ANSWERSTelecommunications and
security systems only
14. The _______ shows power requirements of the structure. - CORRECT-
ANSWERSPower plan
15. The _______ aids the electrical contractor sizing the panel. - CORRECT-
ANSWERSPanel Schedule
16. The _______ plan is supplemented by the fixture schedule. - CORRECT-
ANSWERSLighting
17. The fixture schedule lists lamp _______. - CORRECT-ANSWERSWattage
18. Electrical specifications provide _______. - CORRECT-ANSWERSThe grade
of materials to be used, Materials installation specifics, and how materials
will be used in the finished system
19. _______ must be maintained by the electrical contractor for all installed
work. - CORRECT-ANSWERSAs-built drawings
20. No conductors are smaller than No. _______ wire. - CORRECT-ANSWERS12
, 21. _______ Shall be installed in service entrances and panel feeders. -
CORRECT-ANSWERSRigid conduit
22. The electrical contractor is responsible for providing and installing _______
for a complete telephone system. - CORRECT-ANSWERSOutlet boxes, pull
boxes, and empty raceways
23. Interpretation of construction drawings and specifications may conflict
when _______. - CORRECT-ANSWERSStandard specifications are used with
specific working plans, previously prepared plans are changed and
referenced in the specifications only, and when previously prepared drawings
are amended but not noted on all file drawings
24. Site preparation information is provided on the _______ plan. - CORRECT-
ANSWERSSite
25. The electrical contractor is responsible for all site _______. - CORRECT-
ANSWERSExcavation, surface repair, and pumping
26. To avoid incurring additional costs due to broken lines, underground
wires and utilities must be located _______. - CORRECT-ANSWERSBefore
digging
27. Electrical drawings must be reviewed for existing, or required,
installations of features ______. - CORRECT-ANSWERSUnder the slab-on-grade
and in the basement
28. The electrical contractor is responsible for all costs associated with
_______ where any electrical items were not installed - CORRECT-
ANSWERS28. Cutting and patching only