ICC BOLTING EXAM 2025 UPDATE/PRACTICE QUESTIONS AND CORRECT VERIFIED ANSWERS (complete solutions) ASSURED SUCCESS/GRADED A+!!! According to the Model Program for Special Inspection, the special inspector is to prepare written report of inspection: - CORRECT ANSWER-After each inspection visit - Section II B 5 - Model Programs According to the Model Program for Special Inspection, which of the following items does not need to be included in each inspection report? - CORRECT ANSWER-Description of discussions with the contractor - Section B 5 - Model Programs According to the Specification for Structural Joints using high strength bolts, the nominal diameter of standard bolt holes shall be how much larger than the nominal bolt diameter? - CORRECT ANSWER-1/16 inch - Specification for Structural Joints Table 3.1 Discrepancies in the work shall be brought to the immediate attention of the "blank" for corrective action. - CORRECT ANSWER-the contractor - 2009 IBC, Section 1704.1.2.The special inspector shall furnish inspection reports to the "blank" and to the "blank"? - CORRECT ANSWER-Building Official and Registered Design professional The special inspector shall provide continuos inspection of: - CORRECT ANSWER-Single-pass fillet welds greater than 5/16 inch in size - 2099 IBC, Table 1704.3, Item 5.3 The special inspections required by this code are not required where the work is done on the premise of a? - CORRECT ANSWER-Approved fabricator - 2009 IBC, Section 1704.2.2 The special inspection of the steel fabrication process shall not be required where the fabricator does not perform any? - CORRECT ANSWER-heating operations - 2009 IBC, Section 1704.3, Exceptions # 1 According to the IBC, the "blank" is to hire the special inspector. - CORRECT ANSWER-owner or owners agent. 2009 IBC Section 1704.1 According to the IBC, the "blank" is the responsible for the approval of a person's qualifications to act as a special inspector. - CORRECT ANSWER-code official. 2009 IBC, Section 1704.1 According to the IBC, discrepancy corrections are made known to the building official by: - CORRECT ANSWER-final report. 2009 IBC, Section1704.1.2When is the code official to be made aware of a discrepancy found during a special inspection? - CORRECT ANSWER-If it is not corrected by the contractor. 2009 IBC, Section 1704.1.2 According to the Model Program for Special Inspection, the special inspector is to document work that is nonconforming: - CORRECT ANSWER-In a written report - Section II B 4 - Model Programs

Show more Read less
Institution
Course

Content preview

ICC BOLTING EXAM 2025 UPDATE/PRACTICE QUESTIONS
AND CORRECT VERIFIED ANSWERS (complete solutions)
ASSURED SUCCESS/GRADED A+!!!




According to the Model Program for Special Inspection, the special inspector is to
prepare written report of inspection: - CORRECT ANSWER-After each inspection
visit - Section II B 5 - Model Programs



According to the Model Program for Special Inspection, which of the following
items does not need to be included in each inspection report? - CORRECT
ANSWER-Description of discussions with the contractor - Section B 5 - Model
Programs



According to the Specification for Structural Joints using high strength bolts, the
nominal diameter of standard bolt holes shall be how much larger than the
nominal bolt diameter? - CORRECT ANSWER-1/16 inch - Specification for
Structural Joints Table 3.1




Discrepancies in the work shall be brought to the immediate attention of the
"blank" for corrective action. - CORRECT ANSWER-the contractor - 2009 IBC,
Section 1704.1.2.

,The special inspector shall furnish inspection reports to the "blank" and to the
"blank"? - CORRECT ANSWER-Building Official and Registered Design
professional



The special inspector shall provide continuos inspection of: - CORRECT
ANSWER-Single-pass fillet welds greater than 5/16 inch in size - 2099 IBC, Table
1704.3, Item 5.3



The special inspections required by this code are not required where the work is
done on the premise of a? - CORRECT ANSWER-Approved fabricator - 2009 IBC,
Section 1704.2.2



The special inspection of the steel fabrication process shall not be required where
the fabricator does not perform any? - CORRECT ANSWER-heating operations -
2009 IBC, Section 1704.3, Exceptions # 1

According to the IBC, the "blank" is to hire the special inspector. - CORRECT
ANSWER-owner or owners agent. 2009 IBC Section 1704.1



According to the IBC, the "blank" is the responsible for the approval of a person's
qualifications to act as a special inspector. - CORRECT ANSWER-code official.
2009 IBC, Section 1704.1



According to the IBC, discrepancy corrections are made known to the building
official by: - CORRECT ANSWER-final report. 2009 IBC, Section1704.1.2

, When is the code official to be made aware of a discrepancy found during a
special inspection? - CORRECT ANSWER-If it is not corrected by the contractor.
2009 IBC, Section 1704.1.2



According to the Model Program for Special Inspection, the special inspector is to
document work that is nonconforming: - CORRECT ANSWER-In a written report
- Section II B 4 - Model Programs



According to the Specifications for Structural Steel Buildings, ASTM Standard
"blank" is to be used for the material test for steel sheets. - CORRECT ANSWER-
A568 - Section A31, Specifications for Structural Steel Buildings



According to the Specifications for Structural Steel Buildings, the "blank" conducts
the material tests for identification of the structural steel. - CORRECT ANSWER-
Fabricator or Testing Laboratory - Section A31, Specifications for Structural Steel
Buildings.



According to the Specifications for Structural Steel Buildings, which of the
following steel members are allowed to be unidentified steel? - CORRECT
ANSWER-Unimportant members, where their physical properties and weldability
would not affect the structure strength - Section A31b, Specifications for
Structural Steel Buildings



According to the Code of Standard Practice for Steel Buildings and Bridges, how is
steel of special material to be identified? - CORRECT ANSWER-It is marked by
the supplier - Section 5.1.1, Code of Standard Practice for Steel Buildings and
Bridges

Written for

Course

Document information

Uploaded on
May 31, 2025
Number of pages
25
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$12.99
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF


Also available in package deal

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
NurseAdvocate chamberlain College of Nursing
Follow You need to be logged in order to follow users or courses
Sold
497
Member since
2 year
Number of followers
77
Documents
12046
Last sold
11 hours ago
NURSE ADVOCATE

I have solutions for following subjects: Nursing, Business, Accounting, statistics, chemistry, Biology and all other subjects. Nursing Being my main profession line, I have essential guides that are Almost A+ graded, I am a very friendly person: If you would not agreed with my solutions I am ready for refund

4.6

240 reviews

5
193
4
14
3
16
2
6
1
11

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions