NACE CIP 1 CBT EXAM PRACTICE QUESTIONS AND VERIFIED ANSWERS 2025/2026
NACE CIP 1 CBT EXAM PRACTICE QUESTIONS AND VERIFIED ANSWERS 2025/2026 Dew point is the temperature at which - Answer -condensation occurs. You are the NACE Inspector on a tank lining project where a 50% solids epoxy tank lining is being applied. After application of the 19 coat you notice small blisters in some areas of the applied lining. Your FIRST preferred course of action is to: - Answer -Document the problem and advise the Contractor and Owner's representative. If a contractor is using a poorly maintained compressor to supply air for abrasive blast cleaning and conventional airspray, the coating inspector should perform a - Answer -blotter test for the presence of oil and water. Upon arrival of coating materials, the inspector should - Answer - observe and document the amount of material and batch numbers. Relative humidity is - Answer -a measure of the amount of moisture in the air compared to saturation level. Galvanic corrosion occurs on which of the following substrates? - Answer -Metal When applying Thermal Spray Coatings the specification is most likely to reference: - Answer -SSPC-CS 23.00/AWS C2.23/NACE No. 12What is the minimum recommended distance away from an edge that an inspector should take a measurement with a dial type magnetic pull off Dry Film Thickness(DFT) gauge? - Answer -2.5 cm (1 inch) Polymerization is the process of? - Answer -Monomers joining together. An exposed area of the substrate or previous coat of a conductive material, often caused by poor application technique is called: - Answer -Holiday Checking is: - Answer -a fine crack in the surface of a coating that rarely reaches the substrate. Inspection documentation is important because: - Answer -Owners use the documentation for a variety of purposes. An Inspectors personal log book should contain: - Answer -No comments regarding the application team. You have just received your NACE CIP Level 1 certification when you are asked to supervise a team of uncertified field pipeline inspectors. Your FIRST preferred course of action is to: - Answer -Review the NACE Attestation prior to making a decision. Good record can provide maintenance departments with detailed information about ALL of the following EXCEPT: - Answer -How the item was coated. Non Conformance Reports are completed by the Inspector: - Answer - When the Inspector and Contractor deem it
Geschreven voor
- Instelling
- NACE CIP 1 CBT
- Vak
- NACE CIP 1 CBT
Documentinformatie
- Geüpload op
- 2 juni 2025
- Aantal pagina's
- 20
- Geschreven in
- 2024/2025
- Type
- Tentamen (uitwerkingen)
- Bevat
- Vragen en antwoorden
Onderwerpen
-
nace cip 1 cbt exam
Ook beschikbaar in voordeelbundel