Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

SWM DEQ EXAM|COMPLETE STUDY GUIDE WITH DETAILED QUESTIONS AND 100% RIGHT/VERIFIED ANSWERS|GUARANTEED A PASS|LATEST UPDATED VERSION 2025.

Beoordeling
-
Verkocht
-
Pagina's
15
Cijfer
A
Geüpload op
03-06-2025
Geschreven in
2024/2025

The Virginia Stormwater Management Program is authorized by the ______ and administered through the ______ - CORRECT ANSWERS.️️Virginia Stormwater Management Act, Virginia Stormwater Management Program Regulation VPDES Permit/Construction GP authorizes discharge of stormwater from construction activities that are - CORRECT ANSWERS.️️greater than or equal to an acre The Stormwater Management Act requires the State Water Control Board to - CORRECT ANSWERS.️️permit, regulate, and control stormwater runoff DEQ has ___ days to complete review of real or potential inter-jurisdictional impacts upon request - CORRECT ANSWERS.️️90 The Stormwater Management Act requires the following individuals to obtain and maintain a certificate of competency - CORRECT ANSWERS.️️staff of a stormwater program, anyone contracted by a VSMP authority, standard and specification holders The dual certificate will expire three years from - CORRECT ANSWERS.️️the latest date of the certificates SWM plan must be approved by ___ before land disturbance - CORRECT ANSWERS.️️VSMP program authority The water quality criteria sets a site-based load limit of ____ of total phosphorus for new development - CORRECT ANSWERS.️️0.41 lbs/acre/year The phosphorus load limit uses the - CORRECT ANSWERS.️️10% impervious cover Part II B and II C water quantity criteria addresses - CORRECT ANSWERS.️️channel protection and flood protection Which two plans in the SWPPP must be approved? - CORRECT ANSWERS.️️SWM plan, ESC plan Does the SWM plan address runoff during or after construction? - CORRECT ANSWERS.️️post-construction What is the lower limit of the range of imperviousness that can result in stream degradation? - CORRECT ANSWERS.️️10% What do land disturbing activities consist of? - CORRECT ANSWERS.️️excavating, clearing, grading LDA threshold for the SWM Act and Regulation - CORRECT ANSWERS.️️1 acre or 2500 square feet for Chesapeake Bay Preservation Act In situations where an initial exemption was applicable because LDAs were related to emergency work, VSMP authority shall be advised of the disturbance within - CORRECT ANSWERS.️️7 days of commencing the LDA and shall submit a permit application within 30 days of starting the land-disturbing activity Localities with MS4 - CORRECT ANSWERS.️️must adopt and administer a stormwater program Localities without MS4 - CORRECT ANSWERS.️️may choose to administer a VSMP or have DEQ administer the program DEQ is responsible for enforcing the ____ while locality ____ are responsible for enforcing local ordinances - CORRECT ANSWERS.️️Construction GP, VSMP A locality VSMP authority must include enforcement authority and a schedule of civil penalties for enforcement actions in its local ordinance. The maximum penalty the authority may issue is - CORRECT ANSWERS.️️$32,500 per violation per day

Meer zien Lees minder
Instelling
SWM DEQ
Vak
SWM DEQ

Voorbeeld van de inhoud

STUDYSAGE



SWM DEQ EXAM|COMPLETE STUDY
GUIDE WITH DETAILED QUESTIONS
AND 100% RIGHT/VERIFIED
ANSWERS|GUARANTEED A PASS|
LATEST UPDATED VERSION 2025.
The Virginia Stormwater Management Program is authorized by the ______ and
administered through the ______ - CORRECT ANSWERS.✔️✔️Virginia Stormwater
Management Act, Virginia Stormwater Management Program Regulation


VPDES Permit/Construction GP authorizes discharge of stormwater from
construction activities that are - CORRECT ANSWERS.✔️✔️greater than or equal
to an acre


The Stormwater Management Act requires the State Water Control Board to -
CORRECT ANSWERS.✔️✔p ️ ermit, regulate, and control stormwater runoff


DEQ has ___ days to complete review of real or potential inter-jurisdictional
impacts upon request - CORRECT ANSWERS.✔️✔️90


The Stormwater Management Act requires the following individuals to obtain and
maintain a certificate of competency - CORRECT ANSWERS.✔️✔️staff of a
stormwater program, anyone contracted by a VSMP authority, standard and
specification holders


The dual certificate will expire three years from - CORRECT ANSWERS.✔️✔️the
latest date of the certificates




SUCCESS

, STUDYSAGE


SWM plan must be approved by ___ before land disturbance - CORRECT
ANSWERS.✔️✔️VSMP program authority


The water quality criteria sets a site-based load limit of ____ of total phosphorus
for new development - CORRECT ANSWERS.✔️✔️0.41 lbs/acre/year


The phosphorus load limit uses the - CORRECT ANSWERS.✔️✔️10% impervious
cover


Part II B and II C water quantity criteria addresses - CORRECT
ANSWERS.✔️✔️channel protection and flood protection


Which two plans in the SWPPP must be approved? - CORRECT
ANSWERS.✔️✔️SWM plan, ESC plan


Does the SWM plan address runoff during or after construction? - CORRECT
ANSWERS.✔️✔p ️ ost-construction


What is the lower limit of the range of imperviousness that can result in stream
degradation? - CORRECT ANSWERS.✔️✔️10%


What do land disturbing activities consist of? - CORRECT
ANSWERS.✔️✔e️ xcavating, clearing, grading


LDA threshold for the SWM Act and Regulation - CORRECT ANSWERS.✔️✔️1 acre
or 2500 square feet for Chesapeake Bay Preservation Act




SUCCESS

Geschreven voor

Instelling
SWM DEQ
Vak
SWM DEQ

Documentinformatie

Geüpload op
3 juni 2025
Aantal pagina's
15
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$14.99
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper
Seller avatar
STUDYSAGE

Maak kennis met de verkoper

Seller avatar
STUDYSAGE Yale University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
3
Lid sinds
2 jaar
Aantal volgers
0
Documenten
1041
Laatst verkocht
11 maanden geleden
SELLING NOTES ONLINE,,GET ALL YOUR STUDY MATERIALS,QUALITY DOCUMENTS FOR BETTER RESULTS

Welcome to my online store, where I offer a variety of high-quality study documents designed to help students excel in their studies. Whether you need notes, summaries, or exam preparation materials, you'll find resources tailored to different subjects and learning styles. My goal is to support your academic journey by providing accessible and effective study aids." offer a variety of high-quality study documents designed to help students excel in their studies. Whether you need notes, summaries, or exam preparation materials, you'll find resources tailored to different subjects and learning styles. My goal is to support your academic journey by providing accessible and effective study aids."

Lees meer Lees minder
0.0

0 beoordelingen

5
0
4
0
3
0
2
0
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen