P-99 / Low PSI Oil Burner
Operator
Save
Get a taste for our practice questions
Learn
Studied 7 terms
Nice work, you're crushing it
Continue studying in Learn
Terms in this set (115)
,All heating, 170 ̊ F
combustion,
and cooking
equipment shall
be provided
with insulation
or the building
construction
shall be fire
protected, so
that during
operation the
surface of
combustible
construction
materials will
not be raised to
a temperature
higher than ____.
,Acceptance Inspected and tested.
tests: Boilers
shall not be
placed in
operation upon
completion of
construction
until they have
been ____ and an
equipment use
permit has
been issued by
the
commissioner.
Periodic boiler Once a year.
inspections: All
boilers shall be
inspected at
least ____
including
chimney
connections.
, Owner's annual Written statement.
statement: The
owner of each
boiler that is
subject to
periodic
inspections
shall file an
annual ____ with
the
commissioner,
specifying the
location of
each boiler and
arrangement
for inspection.
Operator
Save
Get a taste for our practice questions
Learn
Studied 7 terms
Nice work, you're crushing it
Continue studying in Learn
Terms in this set (115)
,All heating, 170 ̊ F
combustion,
and cooking
equipment shall
be provided
with insulation
or the building
construction
shall be fire
protected, so
that during
operation the
surface of
combustible
construction
materials will
not be raised to
a temperature
higher than ____.
,Acceptance Inspected and tested.
tests: Boilers
shall not be
placed in
operation upon
completion of
construction
until they have
been ____ and an
equipment use
permit has
been issued by
the
commissioner.
Periodic boiler Once a year.
inspections: All
boilers shall be
inspected at
least ____
including
chimney
connections.
, Owner's annual Written statement.
statement: The
owner of each
boiler that is
subject to
periodic
inspections
shall file an
annual ____ with
the
commissioner,
specifying the
location of
each boiler and
arrangement
for inspection.