Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

Construction FE Civil Questions with Correct Answers for Specific Exam Mail supergrades12@gmail.com

Beoordeling
-
Verkocht
-
Pagina's
29
Cijfer
A+
Geüpload op
03-06-2025
Geschreven in
2024/2025

Construction FE Civil Questions with Correct Answers for Specific Exam Mail

Instelling
Construction FE Civil
Vak
Construction FE Civil

Voorbeeld van de inhoud

1




Construction FE Civil Questions with Correct
Answers for Specific Exam Mail

Is the most traditional project delivery method and appeals to those looking
for low-cost bids. In this method, the owner contracts designers and builders
separately.

Ans: Design-bid-build



is a construction project delivery method where the designer and builder
work together under a single contract from the beginning of the project in
order to ensure unity and collaboration throughout the process.

Ans: Design- build



Select all that clearly demonstrate an advantage of the Design-Build project
delivery over the Design-Bid-Build approach:




- There is single point of contractual responsibility for the owner for the entire
project

-There are contractual relationships with the Owner that prevent a conflict of
interest

-The design is clearly and explicitly defined at the outset of the project

- The design includes significant collaboration between the Engineer and the
Contractor

-The schedule can be fast-tracked and construction can begin before the
complete project design is finalized

- The Owner will receive a project at the lowest competitive cost

Pretest - Stuvia US

,2


Ans: There is single point of contractual responsibility for the owner for the
entire project



There is single point of contractual responsibility for the owner for the entire
project



The schedule can be fast-tracked and construction can begin before the
complete project design is finalized



An indemnification clause in an engineer's design contract is typically tied to:




A. Negligent engineering design

B. Claims submitted by parties affected by a failure

C. Project cost overruns

D. Improper construction methods by the Contractor

Ans: A. Negligent engineering design



Collusion on a construction project typically refers to which of the following?




A. A practice where multiple contractors conspire to fix prices or rig bids

B. A system where public officials receive money from the contractor after
award

C. Falsely increasing the price of change order

D. Misrepresenting the amount of work that has been completed to get
advance payments



Pretest - Stuvia US

, 3


Ans: A. A practice where multiple contractors conspire to fix prices or rig bids



A preconstruction conference should be he held:




A. Prior to advertising for bids

B. After advertising for bids but before bids are received

C. After bid opening but before award of the contract

D. After execution of an agreement but before Notice to Proceed

Ans: D. After execution of an agreement but before Notice to Proceed



Types of submittals for engineer approval typically include all the following
except:

A. Product data

B. Shop drawings

C. Installation means and methods

D. Mill certificates

Ans: C. Installation means and methods



Which of the following statements best define what is meant by "substantial
completion" with respect to a construction contract?




A. Project can be used and occupied by the owner and is completely
finished B. Project can be used and occupied by the owner but there is still a
punch-list of minor work remaining

C. Contractor's performance bond will be used to finish the remaining work

Pretest - Stuvia US

Geschreven voor

Instelling
Construction FE Civil
Vak
Construction FE Civil

Documentinformatie

Geüpload op
3 juni 2025
Aantal pagina's
29
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$13.99
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
UniTests Teachme2-tutor
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
16
Lid sinds
1 jaar
Aantal volgers
0
Documenten
5179
Laatst verkocht
4 weken geleden

4.0

2 beoordelingen

5
1
4
0
3
1
2
0
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen