1. project is a planned undertaking, with a beginning and end that produces
a well-defined result or product.
2. information system develop- a planned undertaking that produces a new information system
ment project
3. predictive approach to the assumes that the development project can be planned and or-
SDLC ganized and that the new information system can be developed
according to the plan
useful for building systems that are well understood and de-
fined.
company may want to convert its old networked client/server
system to a newer Web-based system that includes a smartphone
app. In this type of project, the staff already understands the
requirements very well, and no new processes need to be added
traditional (70s-90s)
4. adaptive approach to the is used when the system's requirements and/or the users' needs
SDLC aren't well understood. In this situation, the project can't be
planned completely.
Some system requirements may need to be determined after
preliminary development work.
(late 90s-today)
5. project initiation (predictive) In predictive approaches, there is a group of activities that identi-
fies the problem and secures approval to develop a new system
, WGU C790 NURSING INFORMATICS OA EXAM AND PRE ASSESSMENT EX
2024 ACTUAL EXAM 2 VERSIONS (VERSION A AND B) COMPLETE 500 QU
TIONS WITH 100% DETAILED VERIFIED ANSWERS/ ALREADY GRADED A+
Study online at https://quizlet.com/_h57y6t
6. Project planning (predictive) In predictive approaches, there is a group of activities that identi-
fies the problem and secures approval to develop a new system
map out the project's overall structure
7. analysis (predictive) focuses on discovering and understanding the details of the prob-
lem or need. The intent here is to figure out exactly what the
system must do to support the business processes
8. design (predictive) focuses on configuring and structuring the new system compo-
nents. These activities use the requirements that were defined
earlier to develop the program structure and the algorithms for
the new system
9. implementation (predictive) includes programming and testing the system.
10. deployment (predictive) involves installing and putting the system into operation.
11. phases of the system devel- project initiation, project planning, analysis, design, implementa-
opment project (predictive) tion, and deployment
12. support phase (predictive) includes the activities needed to upgrade and maintain the system
after it has been deployed. The support phase is part of the
overall SDLC, but it isn't normally considered part of the initial
development project
13. waterfall model (predictive) the phases of the project flow down, one after another.
This model assumes that the phases can be carried out and
completed sequentially.
After a project drops over the waterfall into the next phase, there