what is the maximum air pressure to which a steel tank should be subjected in a preinstallation test? - CORRECT ANSWER-5 pounds for fiberglass reinforced plastic (FRP) tanks up to 12 feet in diameter what is an acceptable air pressure to which the tanks may be subjected in a pre-installation test? - CORRECT ANSWER-3 pounds for FRP tanks over 12 feet in diameter what is the maximum air pressure to which the tanks should be subjected in a pre-installation test? - CORRECT ANSWER-3 pounds when you are conducting an air test on a tank the type of gauge that should be used is? - CORRECT ANSWER-a pressure gauge with a maximum limit of 10 to 15 PSIG the proper procedure for conducting a pre-installation air test of a steel tank is to? - CORRECT ANSWER-apply 3 to 5 pounds of pressure and soap all surfaces and weld seams visible through the coating while inspecting for bubbles. what is the proper procedure for conducting a pre-installation air test of an FRP tank Under 12 feet in diameter is to.... - CORRECT ANSWER-apply 3 pounds of air pressure and soap all surfaces while inspecting for any sign of a leak either audible or visible in the form of bubbles on the surface a double-walled steel tank build in accordance with UL standard 58 is? - CORRECT ANSWER-requires air testing of the interstitial space prior to installation when tanks arrive at the job site, how should they be unloaded? - CORRECT ANSWER-lifted off with a cable attached to the tank lifting lugs As an alternative lifting method, should a cable or chain be wrapped around the tank? - CORRECT ANSWER-No, Never! When you are lifting a tank, using the lifting lugs, which of these procedures should be followed? - CORRECT ANSWER-attach a triangle cable through the lugs with no more than a 30 degree angle from the center line. After you unload a new tank on a clean level surface at the job site what else should you do prior to inspection and pre-testing? - CORRECT ANSWER-Chock the tank to prevent it from Rolling which of the following items should be physically checked for damage or imperfections at the job site? - CORRECT ANSWER-Piping (steel and fiberglass) Fittings, Vents, Fillboxes, anodes, ECT..The tanks themselves (ALL OF THE ABOVE)! STI-P3 tanks are delivered with shipping plugs in tank openings. What should be done to these plugs prior to testing? - CORRECT ANSWER-remove the plugs and replace them with a standard threaded plug that is properly doped should dielectric bushings be installed in all openings of an STI-P3 tank? - CORRECT ANSWER-yes on all openings

Meer zien Lees minder
Instelling
Kentucky UST Certification
Vak
Kentucky UST Certification

Voorbeeld van de inhoud

Kentucky UST Certification Test Prep
what is the maximum air pressure to which a steel tank should be subjected in a pre-
installation test? - CORRECT ANSWER-5 pounds

for fiberglass reinforced plastic (FRP) tanks up to 12 feet in diameter what is an
acceptable air pressure to which the tanks may be subjected in a pre-installation test? -
CORRECT ANSWER-3 pounds

for FRP tanks over 12 feet in diameter what is the maximum air pressure to which the
tanks should be subjected in a pre-installation test? - CORRECT ANSWER-3 pounds

when you are conducting an air test on a tank the type of gauge that should be used is?
- CORRECT ANSWER-a pressure gauge with a maximum limit of 10 to 15 PSIG

the proper procedure for conducting a pre-installation air test of a steel tank is to? -
CORRECT ANSWER-apply 3 to 5 pounds of pressure and soap all surfaces and weld
seams visible through the coating while inspecting for bubbles.

what is the proper procedure for conducting a pre-installation air test of an FRP tank
Under 12 feet in diameter is to.... - CORRECT ANSWER-apply 3 pounds of air pressure
and soap all surfaces while inspecting for any sign of a leak either audible or visible in
the form of bubbles on the surface

a double-walled steel tank build in accordance with UL standard 58 is? - CORRECT
ANSWER-requires air testing of the interstitial space prior to installation

when tanks arrive at the job site, how should they be unloaded? - CORRECT
ANSWER-lifted off with a cable attached to the tank lifting lugs

As an alternative lifting method, should a cable or chain be wrapped around the tank? -
CORRECT ANSWER-No, Never!

When you are lifting a tank, using the lifting lugs, which of these procedures should be
followed? - CORRECT ANSWER-attach a triangle cable through the lugs with no more
than a 30 degree angle from the center line.

After you unload a new tank on a clean level surface at the job site what else should
you do prior to inspection and pre-testing? - CORRECT ANSWER-Chock the tank to
prevent it from Rolling

which of the following items should be physically checked for damage or imperfections
at the job site? - CORRECT ANSWER-Piping (steel and fiberglass)
Fittings, Vents, Fillboxes, anodes, ECT..

,The tanks themselves
(ALL OF THE ABOVE)!

STI-P3 tanks are delivered with shipping plugs in tank openings. What should be done
to these plugs prior to testing? - CORRECT ANSWER-remove the plugs and replace
them with a standard threaded plug that is properly doped

should dielectric bushings be installed in all openings of an STI-P3 tank? - CORRECT
ANSWER-yes on all openings



the proper procedure for conducting a pre-installation air test of a double-walled tank is
to? - CORRECT ANSWER-pressurize the inner tank monitor the pressure for one hour
and then pressurize the space between the inner and outer tanks with the air from the
inner tank

when shipped a steel tank is covered with a coating that is an important part of the
tanks Corrosion Prevention system. "holidays" which show up in the coating at the
installation site should? - CORRECT ANSWER-should be touched up with a compatible
coating after proper surface preparation

touch up of holidays in a steel tank coatings at the installation site should be done....... -
CORRECT ANSWER-according to the manufacturer's instructions

dielectric bushings are usually made of what? - CORRECT ANSWER-non-metallic
material

factors to consider in determining the size shape and depth of a tank excavation include
what? - CORRECT ANSWER-*the tank manufacturers recommendations
*the requirements for compacting bedding and backfill as well as stability of the soil
*the depth of cover

AKA all of the above

in the absence of local requirements the recommended minimum distance between a
tank excavation and adjacent structures or property lines is how many feet? -
CORRECT ANSWER-5 feet

reinforcement of a steel underground tank may be required by the tank manufacturer if -
CORRECT ANSWER-the burial depth is greater than the tank diameter

according to FRP tank manufacturers specifications the burial depth for an FRP tank
should not exceed how many feet? - CORRECT ANSWER-7 feet

, when installing a cathodically protected steel tank you should - CORRECT ANSWER-
make sure the excavation is free from material that could cause damage to the coating

when installing dielectric bushings in a cathodically protected steel tank prior to placing
the tank in the excavation you should - CORRECT ANSWER-make sure that no electric
current can pass through the dielectric flanges or bushings

industry codes as well as the specifications of individual manufacturers do not entirely
agree as to the minimum space that should be maintained between tanks and stalled in
stable soil conditions. what ranges of minimum spacing between tanks derived from
various industry codes and manufacture specifications which range is most accurate. -
CORRECT ANSWER-from 12 inches to 24 inches

acceptable bedding material for steel tanks include.... - CORRECT ANSWER-clean
washed well granulated gravel sand or Rock between 1/8 inch and 1/2 inch in size

pea gravel with a minimum diameter of 1/8 inch and a maximum diameter of 3/4 inch

number 8 crushed stone

how should steel tanks should be lowered into the excavation - CORRECT ANSWER-
through the use of lifting lugs installed by the manufacture and use of lifting equipment
of sufficient capacity to lift and lower the tank

when installing a steel tank which has zinc anodes welded directly onto the tank for
cathodic protection you should - CORRECT ANSWER-remove the plastic wrapping
around the anodes prior to installation

if local authorities and tank manufacturers permit a sand slurry mixture to be used for
backfilling a tank what steps should be taken to ensure that use of the slurry is proper? -
CORRECT ANSWER-use only Personnel trained in the sand slurry method by the tank
manufacturer and use the method only with the manufacturer's prior approval

in making a tank excavation if you discover that the specific call for the burial depth of
the steel tank to be greater than the tank diameter what should you do? - CORRECT
ANSWER-consult the tank manufacturer to determine if reinforcements will be required

what is the minimum depth of bedding required for a pipe trench in traffic areas? -
CORRECT ANSWER-6 inches

measured from the finish grade what is the minimum burial depth for the piping system
of an underground tank and traffic areas? - CORRECT ANSWER-18 inches

when planning your trenches for the piping system how much slope toward the tank
should be allowed for each linear foot of piping? - CORRECT ANSWER-1/8 inch

Geschreven voor

Instelling
Kentucky UST Certification
Vak
Kentucky UST Certification

Documentinformatie

Geüpload op
6 juni 2025
Aantal pagina's
17
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$10.99
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
Brainarium Delaware State University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
1926
Lid sinds
3 jaar
Aantal volgers
1044
Documenten
22953
Laatst verkocht
3 dagen geleden

3.8

327 beoordelingen

5
152
4
62
3
55
2
16
1
42

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen