Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

MTA TOWER OPERATOR STUDY GUIDE QUESTIONS & ANSWERS (RATED A+)

Rating
-
Sold
-
Pages
10
Grade
A+
Uploaded on
07-06-2025
Written in
2024/2025

ABSOLUTE BLOCK - ANSWERA block that may be occupied by only one train at a time. REROUTING - ANSWERDiverting a train from its normal route because of blockage or unusual occurrence RELAY TRACK - ANSWERA track outside the station limits on which a train is placed when being relayed or "swung" from one station to another station SIGNAL YELLOW OVER GREEN - ANSWERProceed on the main route, be prepared to stop at the next signal SUBDIVISION "A" SIGNAL DISPLAYING YELLOW OVER RED WITH AN ILLUMINATED "S" - ANSWERApproach at allowable speed, then continue on the main route

Show more Read less
Institution
MTA TOWER OPERATOR
Course
MTA TOWER OPERATOR

Content preview

MTA TOWER OPERATOR STUDY
GUIDE QUESTIONS & ANSWERS
(RATED A+)



ABSOLUTE BLOCK - ANSWERA block that may be occupied by only one train at a
time.

REROUTING - ANSWERDiverting a train from its normal route because of blockage
or unusual occurrence

RELAY TRACK - ANSWERA track outside the station limits on which a train is
placed when being relayed or "swung" from one station to another station

SIGNAL YELLOW OVER GREEN - ANSWERProceed on the main route, be
prepared to stop at the next signal

SUBDIVISION "A" SIGNAL DISPLAYING YELLOW OVER RED WITH AN
ILLUMINATED "S" - ANSWERApproach at allowable speed, then continue on the
main route

Bulletin 32-17 Proper Tower Identification - ANSWEREmployees must identify the
tower by location name ex. 207 master toweer

Bulletin 55-17 Application of Appropriate Lever Blocking Devices - ANSWERLBD
must be applied when Signal Maintainers are working on a switch and must not be
removed until confirmation of completion of work is received

Lever Blocking Devices must be placed as instructed by RCC and may ot be moved
unless instructed by RCC

Bulletin 61 - 17 Station Public Address Announcements - ANSWERAt location were
D.A are not available Tower Operators and Train Dispatchers are responsible for
making train service delay announcements.


REVENUE TRAIN - ANSWERA train that carries passengers

TIMETABLE - ANSWERShows the time the train is due to arrive and leave from
each listed terminal, arriving and/or departing times at intermediate stations , running
times, headways, and train routes

, GAP STATIONS - ANSWERKey locations between the terminals of a line where
trains are recorded as they pas by, can be properly spaced and can be held for
connections


DWARF SIGNAL - ANSWERA signal with a fixed STOP indication displaying red
over red

AUTOMATIC SIGNAL - ANSWERA signal that is controlled by the movement of
trains

INTERLOCKING SIGNAL - ANSWERA signal at a fixed location indicating a
condition controlling the movement of trains

TOWER OPERATORS - ANSWER(a) Required to familiarize themselves with the
rules and regulations
(b) train schedules
(c) maintain records of all train movements

OBSTRUCTION ON TRACK, A TOWER OPERATOR WILL - ANSWERNotify RCC
and display a red signal

WITHOUT PROPER AUTHORITY, A TOWER OPERATOR MUST NOT -
ANSWERRemove authorized appliances from machines

TOWER OPERATORS MUST NOTIFY RCC WHEN - ANSWER(a) unusual
conditions
(b) unusual intervals bet trains
(c) operating part time tower

EXPEDITING SERVICE, TOWER OPERATOR MUST - ANSWERCrank switches,
and flag trains

TOWER OPERATORS MUST OBSERVE - ANSWERstation platforms and model
boards

RULE 9.05 (n) - ANSWER"When for any reason it is necessary to divert a train from
its regular route, the switch must not be set for the diverging move."

TOWER OPERATORS MAY TAKE INSTRUCTION FROM - ANSWERDispatchers
and assistant dispatchers, superintendents RTO

WHEN OPERATING AN INTERLOCKING MACHINE, TOWER OPERATORS MUST
- ANSWERCooperate with Maintainers

FROG - ANSWERTwo running rails that intersect

TYPE VIII track - ANSWERConcrete and rubber padding

TYPE III track - ANSWERUsed for elevated structures

Written for

Institution
MTA TOWER OPERATOR
Course
MTA TOWER OPERATOR

Document information

Uploaded on
June 7, 2025
Number of pages
10
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$17.99
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
nursingismylife West Virginia University
Follow You need to be logged in order to follow users or courses
Sold
259
Member since
3 year
Number of followers
174
Documents
9125
Last sold
2 weeks ago

3.6

38 reviews

5
14
4
12
3
3
2
1
1
8

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions