you have installed the comp rope sheave. what must you do to prepare for comp rope install? -
ANSWER-block the comp sheave above normal position
you are about to perform maintenance on pit equip. what is required for oil buffers? - ANSWER-
check the oil level
you are working in a pit 72" deep. what does asme require regarding stop switches? - ANSWER-
a second stop switch must be installed 47" above the pit floor
what would you use to connect round rails? - ANSWER-bushings
you are moving rails to storage. what should be taken into consideration? - ANSWER-floor load
capacity
you must stack rails on the floor of a storage room. how do they go? - ANSWER-on their backs
you are installing rails with little distance between the beam and rail. what type of bracket must
you use? - ANSWER-angle bracket
you must fasten a bracket to a brick wall. how do you do it? - ANSWER-(quick bolt that bitch)
use a threaded rod and thru plate it
when installing formed guide rails, what must be done to ensure that the guide rail is secured to
the rail bracket? - ANSWER-rail clip heel must contact the edge of the rail
,2|Page
you are installing a heavy duty freight. what clips should you use? - ANSWER-forged
how much does a 16', 15lb rail weigh? - ANSWER-240lbs
you are aligning t rails. which tool will help you maintain proper DBG? - ANSWER-bayonet gauge
you are building a hoistway guard rail. how much lateral force must the top rail be capable of
taking - ANSWER-200lb
before beginning work each day, which of the following safety precautions must be performed -
ANSWER-test safeties
what is the name of the guide rail from which all measurements are taken - ANSWER-king rail
bbg stands for... - ANSWER-back to back guide distance
after surveying the hoistway, you are directed to pull the lines. what will be affected? -
ANSWER-the positions of the rails
you are installing the first set of rail brackets. to provide most stability, what level are the
brackets typically located? - ANSWER-even with the top and bottom care guides
you have installed the rails but need to adjust DBG. which rail would you adjust - ANSWER-
queen
what should be installed to compensate for building compression - ANSWER-jack bolts
, 3|Page
what must be done to the rails to ensure a quiet and smooth ride - ANSWER-file the rail joints
the hoistway is out of plumb. what may correct the issue - ANSWER-pull the lines
you are working on an elevator machine and you notice the drive sheave and brake drum are
directly mounted on the motor shaft. what machine are you working on? - ANSWER-gearless
you must replace a single threaded worm shaft on a geared traction machine, you notice that
the new worm shaft is double threaded. given the same hoist motor rpm, how will this affect
the machine performance - ANSWER-ring gear will turn faster
you are preparing to install machine beams for a geared traction machine and have established
the centerline of the car and counter weight rails. what does this centerline represent -
ANSWER-drive sheave centerline
what references are used to align the deflector sheave in place - ANSWER-drive sheave and
centerline of counterweight DBG
you are installing a basement geared machine bedplate on H beams that have a poured floor
around them. what hardware do you use - ANSWER-bolts, cut washers, locknuts
you have constructed a wooden template for position a basement geared traction machine to
its foundation. what two machine centerline reference points must be marked on the template
to properly orient the foundation bolt holes - ANSWER-worm shaft, sheave shaft
you will be installing a secondary sheave for a high speed gearless traction elevator. what will
this sheave provide - ANSWER-increased traction