Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

CON 216 Exam 3 Questions With 100% Verified Answers!!

Beoordeling
-
Verkocht
-
Pagina's
7
Cijfer
A+
Geüpload op
08-06-2025
Geschreven in
2024/2025

CON 216 Exam 3 Questions With 100% Verified Answers!!

Instelling
CON 216
Vak
CON 216

Voorbeeld van de inhoud

CON 216 Exam 3 Questions With 100%
Verified Answers!!
What is the method used to calculate an equitable adjustment based on the difference
in the original contract price an the actual cost of performance?

Total cost method

A service contract is awarded for ?maintenance services? to maintain the P-7 aircraft at
Westcoast Naval Air Station. The base commander tells the contracting officer that he
immediately needs some minor maintenance services to maintain the hangar in which the
aircraft are located. The labor categories necessary to maintain P-7 aircraft are completely
different from the labor needed to maintain the hangar. The contracting officer issues a
change order to the P-7 maintenance contract to add maintenance of the hangar, increasing
the annual cost of the contract by 3%. This change is:

NOT: Out of scope, because any change that increases the cost of performance is beyond
the authority of the changes clause

All of the following conditions must be met before the Contracting Officer
may acknowledge an assignment of claims except the

assignee is another company

Sluggish Corporation Inc. receives an RFP which contains a design specification for a piece
of equipment to be manufactured by the winning offeror. Upon review of the specification,
the President, Mr. Tortoise, concludes that the specification is ?restrictive?, in that the
specification contains detailed technical requirements that appear to have been taken
directly from the descriptive literature of a product manufactured by the Hare
Corporation. Mr. Tortoise chooses not to submit an offer. Two months later, after the due
date for proposals but before the time for contract award, Mr. Tortoise files a protest at
GAO, alleging the RFP specification was restrictive. GAO will most probably:

, Dismiss the protest as untimely

Who decides which forum in which to file a timely protest?

Protester

AFC was awarded a firm fixed price contract for the construction of a Government
building. A dispute arose during construction regarding the application of a protective
covering for membrane waterproofing on the basement walls. The contract specification
states: ?Waterproofing shall be applied on the bottom floor.? At the time AFC submitted
its bid, AFC interpreted the specification to require application of waterproofing only to
the basement floor, not the basement walls. During performance, the Contracting Officer
disagreed with AFC?s interpretation and advised that the term ?bottom floor? meant the
entire lowest floor of the building, i.e. the basement, and that both the walls and the floor of
the basement must be waterproofed. Consequently, the Contracting Officer directs AFC to
waterproof the basement walls. AFC installs the protective covering and then files a claim
for the additional cost incurred. Who prevails?

NOT: The Government, if its interpretation and AFC's are both reasonable

Which of the following parties would not be considered an "interested Party" as defined by
the FAR?

a company who did not submit a bid and would not receive the award even if its protest was
sustained

which protest PARTICIPANT reviews the agency's action to ensure that the agency
acted in accordance with law?

GAO

An offeror has filed an agency level appeal protest. The contracting officer has decided
the protest against the offeror. What legal recourse does the offeror have at this point?

Appeal the decision to the GAO, if the appeal is filed within 10 calendar days of the receipt
of the decision

A claim must be certified when:

Geschreven voor

Instelling
CON 216
Vak
CON 216

Documentinformatie

Geüpload op
8 juni 2025
Aantal pagina's
7
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$12.99
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF


Ook beschikbaar in voordeelbundel

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
QUINTER New York College Of Dentistry
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
393
Lid sinds
2 jaar
Aantal volgers
105
Documenten
39291
Laatst verkocht
3 dagen geleden

3.6

69 beoordelingen

5
34
4
10
3
7
2
2
1
16

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen