NCCCO TOWER CRANE EXAM ACTUAL EXAM 100 QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A How many broken wires must be present in one stand on one lay for running wire rope to be removed from service - ANSWER-4 ASME 3-2.4.3(b)(1) What is the maximum permitted wind speed when climbing a tower - ANSWER-20mph ASME 3-1.1.5(i) According to ASME B30.3 a crane should be plumbed to - ANSWER-1 to 500 ASME 3-1.1.5(g) According to ASME B30.3 the rated load under static conditions shall not exceed __________________ of calculated tipping loads - ANSWER-63% ASME 3-1.2.1(a) According to ASME B30.3 an overhead power line is ALWAYS considered to be - ANSWER-Energized until the power company has verified it is not energized High Tensile bolts should be marked with manufacturers designation and - ANSWER-Strength rating TCCM Bolting 4-4 Bolt connections for tower sections must use high tensile strength nuts with ratings of - ANSWER-12 TCCM Bolting 4-5 Washers used in high tensile bolt connections shall be marked with - ANSWER-HV TCCm bolting 4-5 Before installation high tensile bolt connection components shall be cleaned and visually examined for - ANSWER-damage and corrosion TcCCM bolting 4-7 When ready to torque the nut on a high tensile bolt connection you should - ANSWER-Lubricate threads TCCM bolting 4-8During tightening of high tensile connections the bolt is stretched tom a specific percentage of its elastic limit at the correct - ANSWER-Torque TCCM bolting 4-9 Preferably the tightening torque shall be applied to the - ANSWER-Nut TCCM bolting 4-9 The tightening torque values placed on the nuts and bolts of high tensile bolt connection are dependent on the - ANSWER-type and size. TCCM bolting 4-9 What components of a tower crane are connected with high/tensile bolt connections? - ANSWERFoundation anchors, tower sections, slewing, ring support TCCM bolting 4-2 When the tower base bolts are torque the counter job should be positioned - ANSWER-0 degrees from the bolt According to the NCCCO Tower Crane reference manual what items below should be part of the operators daily pre check - ANSWER-Wire ropes limit switches. TCCM maintenance 2-19 According to the NCCCO Tower Crane reference manual, how any safety turns (wraps) must be left on the hoist drum when the load hook is in its lowest position - ANSWER-3 TCCM wire rope 5-1 According to NCCCO tower crane reference manual when possible installing the hoist wire rope on a tower crane you should wind the rope with approximately how much of the maximum permissible load - ANSWER-10% TCCM

Meer zien Lees minder
Instelling
Vak

Voorbeeld van de inhoud

NCCCO TOWER CRANE EXAM 2023-2024 ACTUAL
EXAM 100 QUESTIONS AND CORRECT DETAILED
ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED
A
How many broken wires must be present in one stand on one lay for running wire rope to be removed
from service - ANSWER-4 ASME 3-2.4.3(b)(1)



What is the maximum permitted wind speed when climbing a tower - ANSWER-20mph ASME 3-1.1.5(i)



According to ASME B30.3 a crane should be plumbed to - ANSWER-1 to 500 ASME 3-1.1.5(g)



According to ASME B30.3 the rated load under static conditions shall not exceed __________________
of calculated tipping loads - ANSWER-63% ASME 3-1.2.1(a)



According to ASME B30.3 an overhead power line is ALWAYS considered to be - ANSWER-Energized until
the power company has verified it is not energized



High Tensile bolts should be marked with manufacturers designation and - ANSWER-Strength rating
TCCM Bolting 4-4



Bolt connections for tower sections must use high tensile strength nuts with ratings of - ANSWER-12
TCCM Bolting 4-5



Washers used in high tensile bolt connections shall be marked with - ANSWER-HV TCCm bolting 4-5



Before installation high tensile bolt connection components shall be cleaned and visually examined for -
ANSWER-damage and corrosion TcCCM bolting 4-7



When ready to torque the nut on a high tensile bolt connection you should - ANSWER-Lubricate threads
TCCM bolting 4-8

,During tightening of high tensile connections the bolt is stretched tom a specific percentage of its elastic
limit at the correct - ANSWER-Torque TCCM bolting 4-9



Preferably the tightening torque shall be applied to the - ANSWER-Nut TCCM bolting 4-9



The tightening torque values placed on the nuts and bolts of high tensile bolt connection are dependent
on the - ANSWER-type and size. TCCM bolting 4-9



What components of a tower crane are connected with high/tensile bolt connections? - ANSWER-
Foundation anchors, tower sections, slewing, ring support TCCM bolting 4-2



When the tower base bolts are torque the counter job should be positioned - ANSWER-0 degrees from
the bolt



According to the NCCCO Tower Crane reference manual what items below should be part of the
operators daily pre check - ANSWER-Wire ropes limit switches. TCCM maintenance 2-19



According to the NCCCO Tower Crane reference manual, how any safety turns (wraps) must be left on
the hoist drum when the load hook is in its lowest position - ANSWER-3 TCCM wire rope 5-1



According to NCCCO tower crane reference manual when possible installing the hoist wire rope on a
tower crane you should wind the rope with approximately how much of the maximum permissible load -
ANSWER-10% TCCM Wire rope 5-1



According to the ASME B30.3 what is the design factor for rotation resistant load hoist wire rope -
ANSWER-5.0 to 1 ASME 3-15.5 (b)



Who determines the correct hoist wire rope to be installed on tower cranes - ANSWER-Manufacturer



What grade alloy steel chain should be used for crane hoisting slings - ANSWER-80 OSHA 1910.184

, According to ASME B30.3 using rotation resistant running rope on a tower crane how many broken
wires in six rope diameters can you have to leave it in service. - ANSWER-1 ASME 3-2.4.3(b)(2)



According to ASME B30.3 a periodic inspection of a tower cranes wire rope shall be performed at least? -
ANSWER-Annually ASME 3-2.4.2(b)(1)



According to ASME B30.3 which inspection does not require records to be kept - ANSWER-Frequent
ASME 3-2.4.2



Wire rope lubricant is very important. It should be applied according to who's recommendations? -
ANSWER-Manufacturer ASME 3-2.4.4(e)



When you have core failure in wire rope a common result is - ANSWER-reduction in diameter ASME 3-
2.4.2 (Figure 9)



According to OSHA 1926.550, Who is responsible for machinery and equipment inspection before each
use - ANSWER-competent person



With a hook height of 350 feet, where should the hydraulic top climbing unit be positioned before
operating crane according to chart B - ANSWER-Uppermost tie in position



According to spacing chart B what is the distance from the face of the structure to the center line of the
crane - ANSWER-10`10"



When is it permitted to shift the hoist gear of a tower crane - ANSWER-Neutral Gear



According to ASME B30.3 an overhead power line is always considered to be - ANSWER-Energized until
the power company had verified it is not energized



According to ASME B30.3 maintenance personnel are permitted to operate the crane only when -
ANSWER-Performing their duties

Geschreven voor

Vak

Documentinformatie

Geüpload op
8 juni 2025
Aantal pagina's
17
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$14.99
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF


Ook beschikbaar in voordeelbundel

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
NurseAdvocate chamberlain College of Nursing
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
499
Lid sinds
2 jaar
Aantal volgers
77
Documenten
12046
Laatst verkocht
3 dagen geleden
NURSE ADVOCATE

I have solutions for following subjects: Nursing, Business, Accounting, statistics, chemistry, Biology and all other subjects. Nursing Being my main profession line, I have essential guides that are Almost A+ graded, I am a very friendly person: If you would not agreed with my solutions I am ready for refund

4.5

238 beoordelingen

5
191
4
14
3
16
2
6
1
11

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen