Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

SOS NERC PREP - RELIABILITY EXAM LATEST 2024 ACTUAL EXAM 200 QUESTIONS AND CORRECT DETAILED ANSWERS ALREADY GRADED A+

Beoordeling
-
Verkocht
-
Pagina's
104
Cijfer
A+
Geüpload op
12-06-2025
Geschreven in
2024/2025

SOS NERC PREP - RELIABILITY EXAM LATEST 2024 ACTUAL EXAM 200 QUESTIONS AND CORRECT DETAILED ANSWERS (|ALREADY GRADED A+

Instelling
SOS NERC
Vak
SOS NERC

Voorbeeld van de inhoud

ne
SOS NERC PREP - RELIABILITY EXAM LATEST 2024


sh
ACTUAL EXAM 200 QUESTIONS AND CORRECT DETAILED




ne
ANSWERS (|ALREADY GRADED A+
la

tz




sh
Sp
A Balancing Authority has a 200 MW/0.1 Hz frequency bias with zero schedules.

ne
Frequency is 60.00 Hz and ACE is 0, what should the sum of all the Balancing




la
Authorities Interconnection ties equal?
sh




Sp

ne
A) Small MW amount out of the BA
la

tz
B) System Load




sh
Sp

ne
C) Zero




la
D) Total Generation - ANSWER-C) Zero
sh




Sp

ne
A simple power system is composed of three transmission lines that connect the
la

tz

generation area to the load area. The three lines are different lengths, but each




sh
Sp




line has the same impedance. Each line is initially loaded at 200 MW. The SOL of
ne



each line is 400 MW. If one of the three lines trips, what will be the loading on the



la
shortest remaining line and will the SOL of either remaining line be violated?
sh




Sp

ne
A) 400 MW/Yes
la

tz




B) 400 MW/No sh
Sp




C) 300 MW/Yes
ne




la
D) 300 MW/No - ANSWER-D) 300 MW/No
sh




Sp

ne
During a lightning storm, a fault on a transmission line results in the transmission
a




relay operating and locking-out. The transmission line cannot be returned to
tz
l




sh

service. After running a contingency analysis, the Transmission Operator realizes
Sp

ne




that if another transmission line relays, there could be cascading outages into a
la
sh




Sp
la
Sp

, ne
SOS NERC PREP - RELIABILITY EXAM LATEST 2024


sh
ACTUAL EXAM 200 QUESTIONS AND CORRECT DETAILED




ne
ANSWERS (|ALREADY GRADED A+
la

tz




sh
Sp
neighboring system. Which of the following actions is appropriate for the
Transmission Operator?
ne




la
sh




Sp
A) Reduce transmission voltages by 5% to reduce customer demand.




ne
la

tz




sh
B) Notify others in the Interconnection of the situation via an Interconnection-
Sp

ne
wide telecommunications system.




la
sh




Sp
C) Continue operations without notifying anyone but try to reduce system




ne
loading.
la

tz




sh
Sp




D) Prepare a disturbance report and forward it to the Reliability Coordinator. -
ne



ANSWER-B) Notify others in the Interconnection of the situation via an



la
Interconnection-wide telecommunications system.
sh




Sp

ne
A Generator Operator has some vibration problems with a 500MW coal fired
la

tz




steam generator. As the result of the vibration problems the Generator Operator
sh
Sp




has to set the maximum reactive power production for that unit at 25 Megavar
ne




instead of the normal 200 Megavar. Who should the generator operator notify as
la
the result of this problem?
sh




Sp

ne
A) Transmission Operator
a
tz




B) System Coordinator
l




sh
Sp

ne




C) Department of Energy (DOE)
la


D) Regional Reliability Organization - ANSWER-A) Transmission Operator
sh




Sp
la
Sp

, ne
SOS NERC PREP - RELIABILITY EXAM LATEST 2024


sh
ACTUAL EXAM 200 QUESTIONS AND CORRECT DETAILED




ne
ANSWERS (|ALREADY GRADED A+
la

tz




sh
Sp

ne
A high voltage transmission line was scheduled out for routine maintenance




la
several weeks in advance. On the scheduled outage date, field personnel call to
sh




Sp
inform the system operator that they will be taking the line out of service. Bad




ne
weather the previous day has forced other outages. What should the system
la

operator do?
tz




sh
Sp

ne

A) Wait until peak is over to make a decision




la
sh




Sp

ne
B) Run a power flow study to determine the effects of this line outage
la

tz




sh
Sp




C) Do not allow the outage
ne




la
D) Allow the outage because it was scheduled in advanced - ANSWER-B) Run a
sh




Sp
power flow study to determine the effects of this line outage




ne
la

tz




sh
Interconnection frequency is 60.20 Hz. Your ACE is a large positive value and your
Sp




AGC is pulsing your units down. What should you do?
ne




la
sh




A) Suspend AGC and investigate.
Sp

ne
B) Place AGC in flat tie line control.
a
tz




C) Leave AGC in operation as your units respond.
l




sh
Sp




D) Place AGC in constant frequency control. - ANSWER-C) Leave AGC in operation
ne




as your units respond.
la
sh




Sp
la
Sp

, ne
SOS NERC PREP - RELIABILITY EXAM LATEST 2024


sh
ACTUAL EXAM 200 QUESTIONS AND CORRECT DETAILED




ne
ANSWERS (|ALREADY GRADED A+
la

tz




sh
Sp

ne
Which of the following is the most common effect of a Geomagnetic Disturbance




la
on the power system?
sh




Sp

ne
la

A) Increase static electricity
tz




sh
B) Transformer cores becoming saturated
Sp

ne

C) Generator output varies




la
D) Abnormal VAR direction - ANSWER-B) Transformer cores becoming saturated
sh




Sp

ne
la



In a power system, which type of power provides indication of voltage problems,
tz


is critical for support of heavily loaded transmission lines, and is necessary to have




sh
Sp




sufficient dynamic reserves in preparation for a contingency?
ne




la
sh




A) Solar Power
Sp

ne
B) Real Power
la

tz




C) Reactive Power sh
Sp




D) Apparent Power - ANSWER-C) Reactive Power
ne




la
sh




You are a transmission operator and you have several large generators operating
Sp

ne
at full load on the western portion of your transmission system with 34 kV and
230 kV transmission lines connecting the generators to the larger metropolitan
a
tz




and Industrial areas in the eastern portion of your transmission system. You
l




sh
Sp




realize by SCADA indications that there is a large power angle approaching 88
ne




degrees between some of the sending busses at the generation sites and the
la


receiving buses around the load areas. You realize that the slightest contingency
sh




Sp
la
Sp

Geschreven voor

Instelling
SOS NERC
Vak
SOS NERC

Documentinformatie

Geüpload op
12 juni 2025
Aantal pagina's
104
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$28.49
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
AllStudyGuidesExamsExpert Chamberlain College of Nursing
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
309
Lid sinds
1 jaar
Aantal volgers
13
Documenten
1033
Laatst verkocht
1 week geleden
Exams Hub

"Academic Success Consultant | Chamberlain & Walden Nursing Specialist. With years of experience supporting nursing students, I provide meticulously organized study documents tailored specifically to the Walden and Chamberlain curricula. My revision exams , case study ,test banks and summaries are designed to mirror the actual course outcomes, focusing on NURS 5051 (Walden) and NR-509 (Chamberlain). Join hundreds of students who have simplified their study routine with my high-yield resources."

Lees meer Lees minder
4.7

268 beoordelingen

5
237
4
8
3
9
2
4
1
10

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen