Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

SOS NERC Prep - RElIABILITY Exam| 200 QUESTIONS AND ANSWERS VERIFIED ANSWERS GRADED A+

Rating
-
Sold
-
Pages
107
Grade
A+
Uploaded on
12-06-2025
Written in
2024/2025

SOS NERC Prep - RElIABILITY Exam| 200 QUESTIONS AND ANSWERS (VERIFIED ANSWERS)| GRADED A

Institution
SOS NERC
Course
SOS NERC

Content preview

ne
SOS NERC Prep - RElIABILITY Exam| 200


sh
QUESTIONS AND ANSWERS (VERIFIED




ne
ANSWERS)| GRADED A
la

tz




sh
Sp

ne
The Reliability Coordinator just informed you of a slow time error correction
which will begin at the top of the next hour. Your EMS system will not let you




la
change your scheduled frequency. Your Frequency Bias Setting is -100 MW/.1Hz.
sh




Sp
What action should you take?




ne
la

tz
A) Increase Net Interchange Schedule by 20 MWs.




sh
Sp

ne




la
B) Inform the Reliability Coordinator that you cannot participate in the time error
sh


correction.




Sp

ne
la

tz

C) Decrease Net Interchange Schedule by 20 MWs.




sh
Sp

ne




la
D) Increase Net Interchange Schedule by 10 MWs. - ANSWER--A) Increase Net
Interchange Schedule by 20 MWs.
sh




Sp

ne
la




A Balancing Authority has a sudden loss of a large block of load in its area. This
tz




sh
loss will be seen instantaneously in the change of which of the following values?
Sp

ne




la
1. Actual Net Interchange
sh




Sp

2. Scheduled Frequency
ne
3. Scheduled Net Interchange
a
tz
l




sh

4. Area Control Error
Sp

ne




la
sh




Sp
la
Sp

, ne
SOS NERC Prep - RElIABILITY Exam| 200


sh
QUESTIONS AND ANSWERS (VERIFIED




ne
ANSWERS)| GRADED A
la

tz




sh
Sp
A) 4 only
ne




la
B) 1 & 3
sh




Sp
C) 1 & 4




ne
D) 3 & 4 - ANSWER--C) 1 & 4
la

tz




sh
Sp

ne
Metered Data included in the calculation of ACE are: dynamic schedules, pseudo
ties, actual frequency, and all __________.




la
sh




Sp

ne
A) Tie lines readings
la



B) Generators output
tz




sh
Sp




C) Scheduled frequency indications
ne



D) Transformer load - ANSWER--A) Tie lines readings


la
sh




Sp

ne
Balancing Authority A is currently reading a system frequency of 60.00 Hz. Its Net
la




Actual Interchange is +100 MW and its Net Scheduled Interchange is +200 MW. If
tz




Balancing Authority A's frequency bias setting is 100 MW/0.1 Hz, what is ACE?
sh
Sp

ne




la
A) -100
sh




Sp

B) 0
ne
C) 10
a
tz
l




D) 100 - ANSWER--A) -100
sh
Sp

ne




la
sh




Sp
la
Sp

, ne
SOS NERC Prep - RElIABILITY Exam| 200


sh
QUESTIONS AND ANSWERS (VERIFIED




ne
ANSWERS)| GRADED A
la

tz




sh
Sp

ne
A Balancing Authority has a Net Interchange Schedule of -250 MWs from 1200 to
1600 on a summer day. The Net Interchange Actual for those same hours




la
respectively were -230 MW, -275 MW, -250 MW and -270 MW. What was the
sh




Sp
Balancing Authority's Inadvertent Interchange for the 4-hour period?




ne
la

tz
A) 6 MWs out




sh
Sp

ne

B) 25 MWs in




la
C) 25 MWs out
sh




Sp
D) 6 MWs in - ANSWER--B) 25 MWs in




ne
la

tz


For the ACE equation to work properly, dynamic schedules, pseudo ties,




sh
Sp




frequency, and all ________________ must be metered.
ne




la
sh




A) Generation
Sp

ne
B) Communications
la

tz




C) Transformers sh
Sp




D) Tie lines - ANSWER--D) Tie lines
ne




la
sh




If the frequency bias setting is set to a less negative value than the frequency
Sp

ne
response of a Balancing Authority and a frequency increase is caused by a sudden
loss of load in an external balancing area, what will be the result?
a
tz
l




sh
Sp

ne




A) The ACE will be zero and will take no AGC action
la
sh




Sp
la
Sp

, ne
SOS NERC Prep - RElIABILITY Exam| 200


sh
QUESTIONS AND ANSWERS (VERIFIED




ne
la ANSWERS)| GRADED A




tz




sh
Sp

ne




la
B) The ACE will be a negative value and AGC will increase generation
sh




Sp

ne
C) The ACE will be a positive value and AGC will lower generation
la

tz




sh
Sp

ne
D)This will not affect the ACE - ANSWER--B) The ACE will be a negative value and
AGC will increase generation




la
sh




Sp

ne
If the frequency bias setting is less negative than the frequency response of a
la



Balancing Authority and a frequency decline is caused by a sudden loss of
tz


generation in an external balancing area, what will be the result?




sh
Sp

ne




la
A) The ACE will be a negative value and AGC will increase generation.
sh




Sp

ne
B) This will not affect the ACE.
la

tz




sh
Sp

ne




C) The ACE will be a positive value and AGC will lower generation.
la
sh




Sp

D) The ACE will be zero and will take no AGC action. - ANSWER--C) The ACE will be
ne
a positive value and AGC will lower generation.
a
tz
l




sh
Sp




It is the responsibility of which entity/entities to develop, maintain, and
ne




implement load shedding plans?
la
sh




Sp
la
Sp

Written for

Institution
SOS NERC
Course
SOS NERC

Document information

Uploaded on
June 12, 2025
Number of pages
107
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$28.49
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
AllStudyGuidesExamsExpert Chamberlain College of Nursing
Follow You need to be logged in order to follow users or courses
Sold
309
Member since
1 year
Number of followers
13
Documents
1033
Last sold
1 week ago
Exams Hub

"Academic Success Consultant | Chamberlain & Walden Nursing Specialist. With years of experience supporting nursing students, I provide meticulously organized study documents tailored specifically to the Walden and Chamberlain curricula. My revision exams , case study ,test banks and summaries are designed to mirror the actual course outcomes, focusing on NURS 5051 (Walden) and NR-509 (Chamberlain). Join hundreds of students who have simplified their study routine with my high-yield resources."

Read more Read less
4.7

268 reviews

5
237
4
8
3
9
2
4
1
10

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions