Update 2025-2026 170 Questions and 100%
Verified Correct Answers Guaranteed A+
a 30 * double sling has - CORRECT ANSWER: the same (100%) capacity as a single
leg
A crane can be overloaded with much less than its maximum capacity. True or False? -
CORRECT ANSWER: True. Other factors can create an overloaded situation
A crane can lift a load if the _____ can handle the load - CORRECT ANSWER: Crane
and hook
Rigging
Wire rope
All answers are correct
A crane found to need corrective action in a monthly inspection may be used until the
annual inspection requires a repair. True or False? - CORRECT ANSWER: False
A crane has a crack in the bottom right corner of the windshield. The crane operator -
CORRECT ANSWER: May continue if his vision is in no way obstructed
A crane idle for 3 months must have what type of inspection - CORRECT ANSWER:
Monthly
A crane idle for 3 months must have what type of inspection?
Annual --- incorrect
Monthly
,Shift
Post assembly - CORRECT ANSWER:
A crane must always have at least ____ of a tank of fuel or it is considered a deficiency
by OSHA - CORRECT ANSWER: 50%
A crane must be within 5% level. True or False? - CORRECT ANSWER: False. 1%.
A crane must have at least ______ of a tank of fuel during operation - CORRECT
ANSWER: 1/2
A crane that performs drag line, clam shell, drop ball magnet, container handling,
concrete bucket, and marine operations - CORRECT ANSWER: does not require anti
two block warning (unless pile driving or hoisting people)
A durable legible _______ _______ must be secured to the crane - CORRECT
ANSWER: load chart
A handsignal chart and electrocution danger decal are discovered to be illegible during
an annual inspection, this constitutes a ( ) according to ASME B30.5 - CORRECT
ANSWER: Deficiency
A load chart is only effective if - CORRECT ANSWER: - It is for the crane it is used with
- The outriggers are fully extended or it is listed for partial extension on the chart
- the crane is level
A manufacturer approved wire rope can be replaced by any rope of equivalent strength .
True or False? - CORRECT ANSWER: False. It needs to also be manufacturer
approved of equivalent or greater strength.
, A non discussed, non standard hand signal is given to the crane operator. What should
he do? - CORRECT ANSWER: Safely stop and wait for a standard signal
A non standard hand signal may be used if necessary and is agreed upon prior to when
the lift begins
True or False? - CORRECT ANSWER: True - As long as it is necessary and is agreed
upon prior to the lift begins
A person can direct a lift over an office trailer if - CORRECT ANSWER: Never - never
direct a load over people
A person who by possession of degree, certificate, or professional standing by or by
extensive knowledge or training can solve problems relating to subject matter is: -
CORRECT ANSWER: qualified
A rope impregnated sheave will _________________ - CORRECT ANSWER: damage
a new replacement rope quickly
A rope with reduction in nominal rope diameter of ____ must be removed from service -
CORRECT ANSWER: 5%
A shackle with 15% wear is ok to use
True or False? - CORRECT ANSWER: False - this % is the threshold to remove this
item from service and can no longer be used
A signal made by distinct sound or series of sounds, such as a horn, bell, or whistle is a
/ an - CORRECT ANSWER: audible signal
A signed monthly inspection must be retained for - CORRECT ANSWER: 3 months