A subcontractor or material supplier has _____ days to file a lien once a notice
of completion has been recorded. - accurate answers-30

How must a client submit a claim for service or repair of a defect on fit and
finish items after a remodel? - accurate answers-By certified mail

By overnight mail

By personal delivery

A contractor meets Mr. Jones at his home to discuss remodeling. The
contractor and Mr. Jones sign a contract that includes a three-day cancellation
form. After the contractor leaves, Mr. Jones decides not to have the work done.
Instead of using the cancellation form, Mr. Jones sends the contractor a letter
by first-class mail stating that he is canceling the contract. Is Mr. Jones'
cancellation effective? - accurate answers-Yes. Mr. Jones' letter does cancel the
contract because it indicates his intention not to be bound by the contract.

If a contractor forgets to renew his or her license on time, the expired license
may be renewed any time within _____ after its expiration without reapplying
for a license and fulfilling the exam or waiver requirements again. - accurate
answers-Five years

You are the qualifier for an active contractor's license. How do you inactivate
the license? - accurate answers-Write to the CSLB, requesting that the license
be made inactive.

When a subcontractor does work on a public works contract, the public
agency considers the subcontractor to be: - accurate answers-a subcontractor
of the prime contractor

A contractor hires a subcontractor to demolish a concrete wall. Who is
responsible for supplying safety goggles? - accurate answers-subcontractor

Sometimes contracts prove to be too vague to interpret without disagreement
between owner and contractor. Which of the following steps would best

,prevent such problems? - accurate answers-Review the plans and
specifications with the owner.

A contractor is looking for an insurance policy to cover a high degree of
exposure to risk. Of the following, which policy would be best for this
purpose? - accurate answers-umbrella

To whom do you report and pay sales tax? - accurate answers-Board of
Equalization

The federal Employer Identification Number (EIN) is issued by the: - accurate
answers-Internal Revenue Service

When purchasing insurance, what is the best way to choose among different
companies? - accurate answers-cost and coverage

As required by the Immigration Reform and Control Act, all employees hired
on or after November 7, 1986 must complete Form _____ to verify their
employment eligibility status. - accurate answers-I-9

If required safety devices are missing from tools, what should an employee
do? - accurate answers-Notify the contractor, who is responsible for safety.

Of the following, which document is usually delivered first in a transaction
involving a home improvement contract? - accurate answers-"Notice to
Owner"

Who is ultimately responsible for seeing that safety equipment is actually put
to use on the jobsite? - accurate answers-contractor

A mechanics' lien is a written document that must be signed and verified by
the claimant. The first and third steps a contractor should take in filing a lien
are listed below. Step 1: Obtain the exact legal description of the property.
Step 2: Step 3: Find out if the person requesting the work of improvement is
the owner. What is Step 2? - accurate answers-Find out the name of the legal
owner of the property as well as the percent of ownership.

A(n) _____ represents a company's financial position on a specified date. -
accurate answers-balance sheet

, When you get an approved set of plans, what should you do first? - accurate
answers-Read any notes from the building department.

When bidding on work, which of the following would you NOT include in the
price of your bid? - accurate answers-worker's compensation insurance
premium

The purpose of a "Preliminary 20-day Notice" for private work is to: - accurate
answers-notify the property owner that the subcontractor or firm who sent
the notice will be making improvements on the property

When should you let your attorney see a construction contract? - accurate
answers-After the contract is prepared, but before you sign it.

When is an employee allowed to view their own personnel file? - accurate
answers-whenever they wish to

Before beginning work, an employer or contractor must inquire whether
asbestos is present in any building constructed prior to: - accurate answers-
1978

Is it legal for a contractor to require employees to take lie detector tests? -
accurate answers-It is not legal for the contractor to require lie detector tests,
but it would be legal for a federal, state, or local public agency to require lie
detector tests of their employees.

When is the last day a customer can cancel a contract that was signed on
Friday, December 21st? - accurate answers-the following Wednesday

Which of the following provisions may not be included in a home
improvement contract? - accurate answers-Owner must pay for materials
before they are delivered.

When can a material supplier perfect a mechanics lien? - accurate answers-
After the goods have been installed in the structure.

Every employer of _____ or more full- or part-time employees must keep
written health and safety records for _____ years. - accurate answers-11 ... 5

Geschreven voor

Vak

Documentinformatie

Geüpload op
16 juni 2025
Aantal pagina's
24
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$13.49
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper
Seller avatar
BrunoFernandes

Maak kennis met de verkoper

Seller avatar
BrunoFernandes Chamberlain College Nursing
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
-
Lid sinds
11 maanden
Aantal volgers
0
Documenten
557
Laatst verkocht
-

0.0

0 beoordelingen

5
0
4
0
3
0
2
0
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen