WMGT 101-22A EXAM 3 QUESTIONS AND ANSWERS 100% GUARANTEED PASS/ 2025/2026
WMGT 101-22A EXAM 3 QUESTIONS AND ANSWERS 100% GUARANTEED PASS/ 2025/2026 AFI 10-245, Antiterrorism - CE shall: have at least 1 engineer at each base must complete Security Eng AT Planning & Design Course, review, document, and track construction projects AT compliance, provide vulnerability assessment protection option program (VAPO) analysis for all critical facilities and off-base leases, and work with the Base Antiterrorism Officer Antiterrorism Requirement Planning - 1. UFC 4-020-01 2. Is only the minimum standard required? 3. Yes: construction standoff distance available? No: UFC 4-020-02 and support manuals 4. If standoff distance is available, apply UFC 4-010-01 and support manualsDesign Basis Threat (DBT) - Baseline threat used in the design of protective measures Initial DBT - Based on planning team, local intel and Geographic Combatant Command (COCOM) Theater-Wide threat assessments Modify Initial DBT - Local threat assessments Level of Protection - The degree to which an asset is protected, defines the amount of damage a facility or asset can sustain during an attack LOP: Very low - Progressive collapse is unlikely, but space in and around damaged area will be unusable and onset of structural collapse occurs. Glazing is likely to be propelled into the building and cause serious injuries. Doors may be propelled into rooms, presenting serious hazards.LOP: Low - Building will not be economically repairable and space in and around damaged area will not be usable, but progressive collapse will not occur. Glazing will fracture and may come out of the frame, but does not present a significant injury hazard. Doors may fail but present minimal hazards. LOP: Medium - Minor damage, space in and around damaged area can be used and will be fully functional after cleanup and repairs. Glazing will fracture but remain in the frame. Doors may stay in frames but will not be reusable. LOP: High - Minimal to no damage with no permanent definitions. Glazing will not break. Doors will be reusable. UFC 4-010-01 - DoD minimum antiterrorism standards for buildings. Intent is to reduce mass casualties, minimize collateral damage to nearby facilities, and facilitate future upgrades and increases FPCON
Written for
- Course
- WMGT 101-22A
Document information
- Uploaded on
- June 18, 2025
- Number of pages
- 26
- Written in
- 2024/2025
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
wmgt 101 22a exam 3 questions