Are drawings, diagrams,schedules
Shop drawings and other data prepared to show
how a subcontractor or supplier
purposes to supply and install work
to conform to the requirements of
the contract documents.
Is a process by which a neutral third
Mediation party facilitates and assists the
disputing parties to negotiate a
settlement using preset rules
established by the "AAA" American
Arbitration Association
Arbitration Is a formal, legally binding process
for resolving disputes without
litigation in a court of law.
Change Order Is a document authorizing a
variation from the original contract
documents that involves a change
in contract price, contract time or
both.
Is a written order prepared by the
Construction interior designer directing a
Change Directive
change in the work before the
(CCD)
, owner and contractor agree on an
adjustment in contract cost, time
or both.
Is an important part of the
Project Closeout construction administration phase. It
is during this time that the building
work is completed, the furniture and
fixtures are finally installed, the
structure is made ready for
occupancy and all remaining
documentation takes place.
-To communicate ownership or occupancy
of areas and passengers.
Territoriality -A fundamental aspect of human
behavior and refers to the need to
lay claim to the spaces we occupy
and the things we own.
-In humans it relates to the need for self-
indentity and freedom of choice.
-Bar chart, a schedule in chart format that
Gantt Chart lists individual tasks with a timeline.
-While they are simple and easy to
read, they don't show all sequences
and dependencies. They are good
for use for small to medium-sized
projects.
A diagram showing the earliest and
(CPM) Critical Path latest possible time. CPM chart
Method
identifies specific tasks that will
affect the project finish date.
o—->——>o