PM
IDPX EXAM STUDY GUIDE | INTERIOR DESIGN
PROFESSIONAL EXAM | 93 KEY TERMS & CONCEPTS EXAM
QUESTIONS AND VERIFIED ANSWERS GRADE A++
Terms in this set (93)
covers a range of items, including property
general liability insurance damage, personal injury caused by the
designer or employees, and other liabilities if
contractors or subcontractors do not have their
own insurance
an electric arc is formed generating ultraviolet light. when
fluorescent light this light strikes the
phosphor coating on the inside of the lamp, the
phosphor fluoresces, generating visible light
a method of determining the total cost of a
life cycle cost analysis building or building component or system. initial
costs are added to the costs of financing,
operation, maintenance, and disposal, estimated
over the useful life of the material or system
the total cost to the owner of all components of
project cost a project, including construction, furniture,
equipment, the contractor's overhead and
profit, and the costs of
1/
13
, 6/22/25, 1:33
PM
managing or supervising construction
the designer's professional fees, consultants'
not included in project
fees, financing cost, and other costs that are
cost
the responsibility of the owner
a type of business that is owned by an
sole proprietorship
individual who is personally liable for all debts
of the company
freight bill the invoice from a shipping company
bill of lading a document that lists the contents of a shipment from a
manufacturer or vendor
indirect labor all labor NOT charges to a project or to a revenue
producing account
method of installing flooring that uses either a
thin set method installation
special mortar about 1/8 in thick or an adhesive
a common finishing material used with millwork,
high pressure decorative
made from kraft paper overlaid with a patterned
laminate
or colored sheet and a layer of melamine resin
a statement by a surety company that obligates
performance bond
the surety company to complete construction of
the owner's project if the contractor defaults
used to guarantee payment for labor and
labor and material
materials on a project if the contractor defaults
payment bond
or otherwise fails to make payments
document that governs the sale of goods in the
uniform commercial code
united states and is applicable to the purchase
2/
13