a. CSI MasterFormat
The organization of the technical sections
has been standardized through the
general adoption of the MasterFormat
system developed by the construction
This system is divided
specifications institute to standardize the
into the following
three parts: numbering and format of project related
General/Products/Execu information for use in specifying, cost
tion? estimating and data filing.
a. CSI MasterFormat
The masterFormat system establishes a
b. Guide Specifications
standard way of organizing any
c. Master
Specifications particular specification section. The first
d. CPM System level of division within a section is the
three part
format.
This includes:
1. Part 1, General
2. Part 2, Products
3. Part 3, Execution
All sections include three parts, while the
specific articles within the parts vary with
the type of material or product being
specified.
A schedule for c. window treatment hardware
2/49
,6/22/25, 1:34
PM
construction
drawings would be Schedules show information in tabular
used to indicate format with rows and columns of data.
all of the following They are used because they are a very
except? efficient way to communicate a large
amount of complex information in a
a. ceiling finishes small space. Common schedules for
b. wall finishes
interior design construction drawings
c. window treatment
include room finish, door, kitchen
hardware
equipment, millwork, and hardware.
d. types of doors
Window treatment hardware is NOT part
of construction, while millwork hardware
is.
3/49
, 6/22/25, 1:34
PM
On which drawing b. working drawings
would you find the
on the floor plan, also called working
abbreviations NIC,
drawings, you may see these
BRK, FPL?
abbreviations NIC: not in contract
BRK:
a. millwork elevation
b. working drawings
break
c. power plan FPL:
d. lighting plan fireplac
e
As abbreviations may vary, these should aslo be
listed in the drawing legend.
When preexisting c. interior designer
architectural drawings
do not exist, who is In many cases, the interior designer has
preexisting architectural drawings for the
responsible for
building in which the designed interior
measuring the site
space will be located. In other situations,
and creating the
no existing drawings may exist, and the
architectural
designer will have to measure and
drawings needed for
produce base drawings before
the schematic design
schematic design can begin.
phase?
a. owner
b. contractor
c. interior designer
d. client is responsible
for hiring architects
to create drawings
4/49