AM
PJM OPERATIONS AND
MANAGEMENT PRACTICE TEST EXAM QUESTIONS VERIFIED LATEST
UPDATE 2025/2026
Example questions
1. What is the most effective operating point for generators supplying regulation during
system restoration?
At the middle of their regulating operating range
At the maximum capacity
At the minimum capacity
At the peak load point
2. What does ACE stand for in the context of the PJM Interconnection?
Area Control Error
Flat Tie-Line Automatic Control
Element Active Control Configure
Energy
Take this test
Area Capacity Evaluation
1/
5
, 6/24/25, 7:51
AM 3. Which of the following balancing area control modes is used by PJM under normal
operations?
Tie-Line Bias
Flat
Frequency
4. Frequency Bias
Why is it important for PJM to know when a generator has limited fuel for operation?
5. A 300 MW generator is capable of providing 60 MVAR at full energy output
and be within the limits of its generator operating curve.
The generator is currently operating at its max MW & MVAR output, when due to
voltage problems PJM requests and additional 50 MVAR support from the
generator.
What action will have to be taken in order to accommodate PJM's request?
2/
5