PJM SYSTEM RESTORATION PROTOCOLS EXAM QUESTIONS VERIFIED
LATEST UPDATE 2025/2026
Example questions
1. What is the designated optimal frequency range for the PJM power grid during the
system restoration process?
59.5 - 60.5 Hz
59.75 - 61 Hz
60 - 62 Hz
58.5 - 59.5 Hz
2. The 500 kV system is operated so that on a precontingency basis , all bus voltages
Raise load in island number 1.
Raise generation in island number
are2.maintained between
Raise generation in island number
1. Reduce load in island number Configure
2. to 250 kV
230
Take this test
4. During restoration, if 500 KV transmission line is being restored what are the
minimum source requirements for load and generation
10 MW of load/mile and 15 MW of generation/mile
20 MW of load/mile and 30 MW of generation/mile
25MW of load/mile and 50 MW of generation/mile
https://quizlet.com/test-questions/pjm-system-restoration-protocols-e9a84674-7517-4a47-b7cb- 1/
4aec8d7c0176 5
, 6/24/25, 7:51
AM 490 to 560 kV
500 to 550 kV
525 to 545 kV .
3. If two islands want to interconnect during a system restoration with island #1 operating
at a frequency of 59.5 Hz and island #2 operating at a frequency of 60.3 Hz, what
should the system operators do in order to prepare for successful synchronization
of the
islands?
Raise generation in island number
2. Raise generation in island number
1. Reduce load in island number
2.
4. During restoration, if 500 KV transmission line is being restored what are the
minimum source requirements for load and generation
10 MW of load/mile and 15 MW of generation/mile
20 MW of load/mile and 30 MW of generation/mile
25MW of load/mile and 50 MW of generation/mile