Example questions
1. What is the primary balancing control mode utilized by PJM during standard operational
conditions?
Frequency Response
Tie-Line Bias
Area Control
Error Load
Following
2. What are two key factors that PJM takes into account when conducting their system
load forecast?
Generator Capacity & Fuel Type
Weather Conditions & Day of the
Week Historical Load Data & Market
Prices
Transmission Line Status & Outage Reports
https://quizlet.com/test-questions/pjm-operations-and-regulations-practice-test-f74106af-b3e8-4b25- 1/
9886-310a7f4ad5ae 5
, 6/24/25, 7:51
AM
3. Which of the following limits is NOT required to be submitted to PJM for generating
units?
Eco Min
Eco Max
Dynamic Instability
4. What is the primary purpose of the Remedial Action Reserve in the context of PJM
operations?
To provide backup power during scheduled maintenance
To quickly restore balance to the Area Control Area (ACE) after a disturbance
To forecast load requirements for the upcoming hours
To manage generator limits during peak demand
Emergency Max
Configure
Take this test
https://quizlet.com/test-questions/pjm-operations-and-regulations-practice-test-f74106af-b3e8-4b25- 2/
9886-310a7f4ad5ae 5