PJM OPERATIONS PRACTICE TEST EXAM QUESTIONS AND
ANSWERS WITH COMPLETE SOLUTIONS VERIFIED LATEST
UPDATE GRADED A++
Example questions
1. Real time transmission constraints or contingencies may be alleviated with
generators operating :
below 60 hertz
on a new price
curve on a new
cost curve
off cost ( out of merit)
2. What is the minimum capacity threshold for solar generation facilities to be eligible
for real and reactive power telemetry within the PJM Interconnection system?
Configure
1 MW
3 MW Take this test
5 MW
10 MW
https://quizlet.com/test-questions/pjm-operations-practice-test-70765c72-0f64-4c13-aac4- 1/
cb22a0ece3e4 5
, 6/24/25, 7:52 PJM Operations Practice Test Test Questions |
AM Quizlet
3. All of the following elements must be reported to PJM when an Instantaneous Reserve
Check (IRC) is requested EXCEPT:
Generator MVAR
Reserves Operating
Reserves
Synchronized Reserves
Non-Synchronized Reserves
4. When PJM issues a minimum generation alert, company dispatchers should
compile their emergency reducible information and report to PJM via eDART
complete their emergency reducible information and notify management
call the PJM scheduling coordinator and request full load testing on all shutdown CTs
request generating station personnel to maintain generator output levels above
normal minimums