Quiz: IN Credit: Innovation Requirements, Ans: To achieve all 5 innovation
points, a project team must achieve at least one pilot credit, one innovation
credit, and no more than two exemplary performance credits.
Quiz: IN Credit: LEED Accredited Professional Requirements, Ans: At least
one principal participant of the project team must be a LEED Accredited
Professional (AP) with a specialty appropriate for the project.
Quiz: RP Credit: Regional Priority Requirements, Ans: Earn up to 4 of the 6
Regional Priority credits. A database is listed on USGBC's website.
Quiz: SS Prerequisite: Environmental Site Assessment Requirements -
Applies to Schools and Healthcare only, Ans: Conduct a Phase 1 Environmental
Site Assessment as described in ASTM E1527-05 to determine if environmental
contamination exists. If contamination is suspected, conduct a Phase II
Environmental Site Assessment. If a site is contaminated, remediate the site to
meet local, state, or national environmental protection agency region
residential standards.
Quiz: SS Credit: Site Assessment - Requirements, Ans: Complete and
document a site survey or assessment which includes the following
information: topography, hydrology, climate, vegetation, soils, human use,
© 2025 Get it right Stuvia US All rights reserved
,human health effects. The survey or assessment should demonstrate the
relationship between the site features and topics listed above and how these
features influenced the project design; give the reasons for not addressing any
of those topics.
Quiz: SS Credit: Open Space Requirements, Ans: Provide outdoor space
greater than or equal to 30% of the total site area (including the building
footprint). A minimum of 25% of the outdoor space must be vegetated or have
overhead vegetated canopy. For projects that achieve a density of 1.5 floor-
area-ratio (FAR), and are physically accessible, extensive or intensive vegetated
roofs can be used towards the minimum 25% vegetation requirements.
Wetlands or naturally designed ponds may count as open space if the side
slope gradient average is 1:4 or less and are vegetated.
Quiz: SS Credit: Rainwater Management - Option 1 Requirement, Ans:
Percentile of Rainfall Events: Path 1. 95th Percentile - manage on site the
runoff from the developed site for the 95th percentile of regional or local
rainfall events using low-impact development. Path 2. 98th Percentile - achieve
path 1 but for 98th percentile. 3. Path 3. Zero lot line projects only - 85th
percentile. Applies to zero lot line properties with a FAR of 1.5. Manage on site
the runoff from the developed site for the 85th percentile of regional or local
rainfall events, using LID and green infrastructure.
Quiz: SS Credit: Rainwater Management - Option 2 Requirement, Ans:
Natural Land Cover Conditions - Manage on site the annual increase in runoff
volume for the natural land cover condition to the post developed condition.
© 2025 Get it right Stuvia US All rights reserved
,Quiz: SS Credit: Heat Island Reduction - Option 1 Requirement, Ans: Nonroof
and Roof (area of nonroof measure / 0.5) + (area of high reflectance roof /
0.75) is greater than or equal to the total site paving area and the total roof
area. Nonroof measures - use the existing plant materials or install plants that
provide shade over paving areas on the site within 10 years or planting,
provide shade with structures covered by energy generation systems, provide
shade with architectural devices or structures that have a three-year aged
solar reflectance (SR) value of at least 0.28, vegetated structures, paving
materials with a three-year aged SR value of at least 0.28, use an open-grid
pavement system.
Quiz: SS Credit: Heat Island Reduction - Option 2 Requirement, Ans: Parking
under cover - place a minimum of 75% of parking spaces under cover. Any roof
used to shade or cover parking must (1) have a 3-year aged SRI of at least 32,
(2) be a vegetated roof, or (3) be covered by energy generated systems.
Quiz: SS Credit: Light Pollution Reduction Requirements, Ans: Meet uplight
and light trespass requirements, using either the backlight-uplight-glare (BUG)
method (option 1) or the calculation method (option 2). Meet these
requirements for all exterior luminaries located inside the project boundary
and meet the internally illuminated signage requirement.
Quiz: SS Credit: Site Master Plan Requirements (applies to Schools only),
Ans: The project must achieve at least four of the following using the
associated calculation methods. The achieved credits must then be
recalculated using the data from the master plan: LT Credit High Priority Site;
SS Credit Site Development - Protect or Restore; SS Credit Open Space; SS
Credit Rainwater Management; SS Credit Heat Island Reduction; SS Credit Light
Pollution Reduction.
© 2025 Get it right Stuvia US All rights reserved
, Quiz: SS Credit: Tenant Design and Construction Guidelines Requirements
(applies to Core & Shell only), Ans: Publish for tenants an illustrated document
with the following content as applicable: a description of the sustainable
design and construction features incorporated in the project,
recommendations (including examples) for sustainable strategies, produces,
materials, and services; and information that enables a tenant to coordinate
space design and construction with the building systems when pursing the
following LEED v4 for Interior Design and Construction with prerequisites and
credits. Provide guidelines to tenants before they sign a lease.
Quiz: SS Credit: Places for Respite Requirements (applies to Healthcare only),
Ans: Places of respite which are accessible to patients and visitors, equal to 5%
of the net usable program of the building. Provide additional dedicated places
for respite for staff, equal to 2% of the net usable program. Places of respite -
must be outdoors, in an interior atria, greenhouses, solaria, or conditioned
spaces; such interior spaces may be used to meet up to 30% of the required
area if 90% of each qualifying space's gross floor area achieves a direct line of
sight to unobstructed views of nature.
Quiz: SS Credit: Direct Exterior Access Requirements (applies to Healthcare
only), Ans: Provide direct access to an exterior courtyard, terrace, garden or
balcony. Space must be at least 5 sf / patient for 75% of all inpatients and 75%
of qualifying outpatients whose clinical length of stay exceed 4 hours (patients
who are unable to move may be excluded). Places outside the building must
meet SS Credit Places of Respite. Spaces must be nonsmoking, meeting the
requirements for air containment concentrations in EQ Credit Enhanced Indoor
Air Quality Strategies, Option 2 and be located no more than 100 ft from the
building exhaust locations / loading docks / roadways with idling vehicles.