Guide Questions And Answers Verified 100% Correct
While clearing a magazine for fire prevention you notice there are no fire extinguishers
in any of the magazines. How many hazard-specific fire extinguishers must be readily
accessible where ammo is being handled? - ANSWER 2
You are scheduling a controlled burn to prevent fires. This activity must be located at
least how many feet away from an open storage area or building handling ammunition?
- ANSWER 100ft
You are inspecting a magazine and it has no fire symbols. You know the DODIC has
the abbreviation BBC beside it. Which Fire Symbols should be on the magazine? -
ANSWER symbol 1 set 2
You must inspect several operating buildings. Which of these is a requirement for
operating building exits? - ANSWER self closing doors that swing outward
You are working on a protective construction design. All of these are considerations you
must make for AE storage and operating buildings EXCEPT - ANSWER container locks
One of your facilities requires a change in NEW requirements. Can you modify an
approved construction design to meet NEW requirements for it? - ANSWER No
Risk Management Process - ANSWER identify, assess, develop, implement, supervise
Your installation has a mission change and timeline that requires the major modification
of structures. These modifications will violate explosive safety standards. Which of
these deviations do you need? - ANSWER CCR
You are planning an amnesty day at your installation. Which of these is a true statement
about amnesty turn-ins? - ANSWER ASP accepts without turn-in documents, exempt
from AR 190
When conducting an amnesty day, which of these are true statements about amnesty
boxes? - ANSWER designated personnel can only check, protected from weather
The new commander at your installation needs to know who should be on the Real
Property Planning Board. Which of these individuals should be members of the board?
- ANSWER garrison commander, safety office, environmental coordinator
You are preparing for a presentation with your installation commander about the Real
, Property Master Plan. Which of these goals will you NOT include in your briefing? -
ANSWER defines installations mission and AE requirements
Real Property Master Plan - ANSWER shows all installation buildings, roadmap,
manage installation space
The installation commander told you to redesignate a temporary ammo storage site as a
permanent explosives site. What do you need to do? - ANSWER submit a ESQD
modification plan
The installation administration building at an army ammunition plant is an example of? -
ANSWER ES
You find non-standard AE on the live fire range and you don't know what hazard class
or storage compatibility group it belongs to. What do you consider it? - ANSWER SCG
K
A howitzer catches on fire after being fired causing the firing tube to bend. What is the
class of the incident? - ANSWER Class B
what does it mean if an ammo is approved-nickel-plated and fluted for SAA training? -
ANSWER inert ammo
items considered HERO susceptible - ANSWER may be degraded due to exposure to
an RF environment
EED-equipped ammo can be considered HERO safe when - ANSWER it is in approved
packaging
you need to identify ammo specific requirements for malfunctions, where can you find
this information? - ANSWER AR 75-1
during a malfunction investigation, what does the SO role include? - ANSWER
ensuring prop procedures were followed, deciding is additional procedures are needed,
ensuring the lot is safe
a load of ammo from the ASP has to go back into storage. Which task can be performed
OUTSIDE the magazine? - ANSWER removing grommets, marking containers,
unpacking SAA
one method of preventing static electricity inside an operation area is the use of -
ANSWER conductive flooring system
Your role is to ensure the safety and serviceability of the stockpile and monitor AE