ISTQB Foundation Level CTFL_001 UPDATED
ACTUAL Exam Questions and CORRECT Answers
… 1/80
,6/28/25, 5:36 PM ISTQB Foundation Level CTFL_001 UPDATED ACTUAL Exam Questions and CORRECT Answers Flashcards | Quizlet
1. A. Regression tests run and passed in systems testing
Test objectives for systems
testing of a safety critical
system include
completion of all
outstanding defect
correction. Regression
testing is required
following defect
correction at all test
levels. Which TWO of the
following metrics would
be MOST suitable for
determining whether the
test objective has been
met?
A. Regression tests run
and passed in systems
testing
B. Incidents closed in
systems testing
C. Planned tests run and
passed in system testing
D. Planned tests run and
passed at all levels of
testing
E. Incidents raised and
closed at all levels of
testing
F. a and e
G. b and c
H. d and e
I. a and b
… 2/80
,6/28/25, 5:36 PM ISTQB Foundation Level CTFL_001 UPDATED ACTUAL Exam Questions and CORRECT Answers Flashcards | Quizlet
… 3/80
, 6/28/25, 5:36 PM ISTQB Foundation Level CTFL_001 UPDATED ACTUAL Exam Questions and CORRECT Answers Flashcards | Quizlet
2. D. Title. Screen TRN-003B validation of transaction
Test script TransVal 3.1 date. Reproducible. Yes. Description. Script eod 1.4
tests transaction validation fails when the first transaction of the day is a future
via screen TRN 003B. dated transaction. Screen shot of the failure attached.
According to the Validation of transaction entry on screen TRN-003B
specification (PID ver 1.3 should not allow future dated transactions see PID ver
10b iv) the validation 1.3 para 10b iv.
screen should not accept
future dated transactions.
Test script TransVal 3.1
passes. Test script eod 1.4
tests end of day
processing and is run after
the execution of TransVal
3.1 using data entered
during that testWhich of
the following is the BEST
detail on an incident
report?
A. Title. End of Day failure..
Reproducible. Yes.
Description. Script eod 1.4
fails when the first
transaction of the day is a
future dated
transaction.Screen shot of
the failure attached.
B. Title. Transaction input
screen
validation..Reproducible.
Yes. Description. Script
eod 1..4 fails .Screen shot
of the failure attached.
Validation of transaction
entryon screen TRN-003B
should not allow future
dated transactions see PID
… 4/80