Tank with liquid filled annular or that has vacuum on it at the tine of delivery do not require provided manufacturer pre-installation procedures are followed A. True B. False A. True A safety harness must be worn when working in a confined space A. True B. False A. True A typical type of leak detection for suction piping is A. Under-pump check valve B. Electronic line leak detection C. Automatic tank gauge (ATG) A. Under-pump check valve A typical type of release detection equipment for pressurized piping is A. Electronic line leak detectors B. Mechanical line leak detectors C. Interstitial monitoring D. All of the above D. All of the above A UST system can be temporarily closed for___months. After this time period the tanks must be removed or put back into service A. 12 months B. 36 months C. 48 months A. 12 months After backfill is placed to the level of the top of the tank, it is recommended that the tank be ballasted with product or water A. True B. False A. True All methods of tank anchoring use the weight of the backfill and paving on top of the tank to offset the buoyancy forces A. True B. False A. True All UST systems equipped with cathodic protection systems must have the system inspected within___months of installation and every___years thereafter by a qualified cathodic protection tester A. 1 month / 1 year B. 6 month / 3 year C. 1 year / 5 year B. 6 month / 3 year An acceptable form of cathodic protection system is A. Impressed current B. Sacrificial anode C. Spray paint D. Both A and B D. Both A and B An efficient piping layout minimizes the length of piping, enhances operations, and facilities testing and services A. True B. False A. True An individual can enter a confined space without an entry plan as long as he tells someone what he is doing

Show more Read less
Institution
UST Installer
Course
UST Installer

Content preview

U1 UST Installation/Retrofitting



UST Installer Exam Study Guide Questions and
Answers 2025
Tank with liquid filled annular or that has vacuum on it at the tine of delivery do
not require provided manufacturer pre-installation procedures are followed
A. True
B. False
A. True
A safety harness must be worn when working in a confined space
A. True
B. False
A. True
A typical type of leak detection for suction piping is
A. Under-pump check valve
B. Electronic line leak detection
C. Automatic tank gauge (ATG)
A. Under-pump check valve
A typical type of release detection equipment for pressurized piping is
A. Electronic line leak detectors
B. Mechanical line leak detectors
C. Interstitial monitoring
D. All of the above
D. All of the above
A UST system can be temporarily closed for___months. After this time period the
tanks must be removed or put back into service
A. 12 months
B. 36 months
C. 48 months
A. 12 months


U1 UST Installation/Retrofitting

,U1 UST Installation/Retrofitting


After backfill is placed to the level of the top of the tank, it is recommended that
the tank be ballasted with product or water
A. True
B. False
A. True
All methods of tank anchoring use the weight of the backfill and paving on top of
the tank to offset the buoyancy forces
A. True
B. False
A. True
All UST systems equipped with cathodic protection systems must have the system
inspected within___months of installation and every___years thereafter by a
qualified cathodic protection tester
A. 1 month / 1 year
B. 6 month / 3 year
C. 1 year / 5 year
B. 6 month / 3 year
An acceptable form of cathodic protection system is
A. Impressed current
B. Sacrificial anode
C. Spray paint
D. Both A and B
D. Both A and B
An efficient piping layout minimizes the length of piping, enhances operations, and
facilities testing and services
A. True
B. False
A. True
An individual can enter a confined space without an entry plan as long as he tells
someone what he is doing


U1 UST Installation/Retrofitting

, U1 UST Installation/Retrofitting


A. True
B. False
B. False
An overfill device that alerts the transfer operator when the tank is no more than
90% full by restricting flow to the tank or triggering a high level alarm is an
approved method of overfill prevention
A. True
B. False
A. True
An overfill prevention device that automatically shuts off flow into the tank when
the tank is no more than___% full is an approved method of overfill prevention
A. 80%
B. 90%
C. 95%
C. 95%
At a minimum, the site safety plan should included:
A. A list of emergency service organizations that may be needed (Fired Dept.,
Hazmat team, local hospital)
B. A list of emergency equipment (fire extinguisher, absorbent pads, etc.)
C. A list of utility company contacts (power, gas, and water)
D. All of the above
D. All of the above
Backfill material for fiberglass tanks should be free of ice and snow and not more
than ___% should pass through a #___ sleeve
A. 5% / #8
B. 7% / #8
C. 10% / #4
A. 5% / #8
Backfill material for steel tanks should be clean, well-granulated, free-flowing,
non-corrosive, nerf material.


U1 UST Installation/Retrofitting

Written for

Institution
UST Installer
Course
UST Installer

Document information

Uploaded on
July 1, 2025
Number of pages
19
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$17.49
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
PossibleA Chamberlain College Of Nursing
Follow You need to be logged in order to follow users or courses
Sold
1037
Member since
5 year
Number of followers
650
Documents
13574
Last sold
1 week ago
POSSIBLEA QUALITY UPDATED EXAMS

Choose quality study materials for nursing schools to ensure success in your studies and future career. "Welcome to PossibleA - your perfect study assistant! Here you will find Quality sheets, study materials, exams, quizzes, tests, and notes to prepare for exams and study successfully. Our store offers a wide selection of materials on various subjects and difficulty levels, created by experienced teachers and checked for quality. Our quality sheets are an easy and quick way to remember key points and definitions. And our study materials, tests, and quizzes will help you absorb the material and prepare for exams. Our store also has notes and lecture summaries that will help you save time and make the learning process more efficient.

Read more Read less
3.9

148 reviews

5
77
4
25
3
22
2
1
1
23

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions