CRAFT : BOILERMAKER STUDY GUIDE EXAM QUESTIONS AND
ANSWERS WITH COMPLETE SOLUTIONS VERIFIED LATEST
UPDATE 2025/2026
Terms in this set (40)
What is the first piece of the The downcomer
tray floor, that is installed ?
The Tube
Identify part 1 of the Heat
Exchanger
What problems are Improper expanding and depth
associated with tube rolling
?
Why are the lockouts/tag To prevent the operation
outs used in valves ,
switches, and equipment?
A "Red Tagged" OSHA Do Not Use
approved scaffold means
Dollar Plate
Identify part 2 of the Heat
Exchanger
1/
6
, 6/30/25, 5:36
PM
Before dismantling a heat All of the above
exchanger , it must be
A replied valve is to be Plugged or capped
moved between the shop
and the field . The valve
should be
The following figure shows Bowline
how to be a
A tag line is necessary when Making any lift
Baffle
Identify part 4 of the Heat
Exchanger
A "Yellow Tagged" OSHA Use with fall protection only
approved scaffold mean
What is the distance from 7/8"
the start of the standard
ruler to the letter "B" ?
The following figure shows Barrier Hitch
how to tie a :
For a good bolt up , how 2
many threads
should be exposed past the
hex but after tighting ?
2/
6