API 1169. study test questions test
questions with answers
According to FERC, environmental Inspectors shall have _____________
status in regards to all other craft inspectors. - CORRECT ANSWER>>Equal
According to Title 49 CFR 195, any new pipe with a diameter greater than
___________ inches must be marked with the specification, the
SMYS/Grade, and pipe size. - CORRECT ANSWER>>4.5
This legislation covers hazardous substance, site contamination, and cleanup
- CORRECT ANSWER>>Comprehensive environmental recovery,
compensation, and liability act.
A blueprint showing the exact route of a pipeline and virtually all of the
knowledge that exist for that pipeline when constructed is called a
______________? - CORRECT ANSWER>>Alignment sheets
In area is considered oxygen deficient if the oxygen level is below
___________ % - CORRECT ANSWER>>19.5
During a pressure test, if a leak develops on a connection, yomust
depressurize to a safe level and then - CORRECT ANSWER>>re-tighten the
connections
,Which listed non-destructive testing method is specified in API 1104? -
CORRECT ANSWER>>RT examination
Prior to a hydrotest, ensure that the _______ has approved the de-watering
location. - CORRECT ANSWER>>Environmental Inspector
As an inspector, you should ensure that there is always a (n) on a site with an
open excavation. - CORRECT ANSWER>>designated competent person
Calculate the top width of a bell hole excavation using the following
information: Depth of ditch: 8 feet Bottom Width: feet Soil type: C - CORRECT
ANSWER>>30 : formula soil type C : 3 x depth + bottom width = top width
Demonstrated ability to apply knowledge and skills. - CORRECT
ANSWER>>competence
According to the EPA, which phase covers containment, countermeasures,
cleanup, and disposal for response for oil removal after a spill. - CORRECT
ANSWER>>Phase III
Which refarence in 40 CFR Part 300 claifies procedures for planning and
implementing off-site response actions for hazardous substances? - CORRECT
ANSWER>>300.440
The color code for marking oil & gas buried utilities during sweep is
_____________? - CORRECT ANSWER>>yellow
, According to OSHA, excavations that are less than 5' in depth & the
examination of the ground by a competent person provides no indication of
a potential cave-in, is not required to have any type of protection system. -
CORRECT ANSWER>>True
MOC stands for ____________? - CORRECT ANSWER>>management of
change
Replica tape is used during __________ measurements? - CORRECT
ANSWER>>surface profile
Where can the exact code for strength test requirements be found for
carbon steel (natural gas) pipelines to operate at a hoop stress of 30% or
more of SMYS? - CORRECT ANSWER>>192.505
Title 49, CFR 195: The total number of girth welds and the number
nondestructively tested, including the number rejected and the disposition of
each rejected weld records must be maintained for at least - CORRECT
ANSWER>>5 years
According to Title 49, CFR 192, Subpart N: Records of prior qualification and
records of individuals no longer performing covered tasks shall be retained
for a period of ______________ years. - CORRECT ANSWER>>5
During weld qualification, the fillet weld specimens can be broken inside the
weld by any convenient method. - CORRECT ANSWER>>true
questions with answers
According to FERC, environmental Inspectors shall have _____________
status in regards to all other craft inspectors. - CORRECT ANSWER>>Equal
According to Title 49 CFR 195, any new pipe with a diameter greater than
___________ inches must be marked with the specification, the
SMYS/Grade, and pipe size. - CORRECT ANSWER>>4.5
This legislation covers hazardous substance, site contamination, and cleanup
- CORRECT ANSWER>>Comprehensive environmental recovery,
compensation, and liability act.
A blueprint showing the exact route of a pipeline and virtually all of the
knowledge that exist for that pipeline when constructed is called a
______________? - CORRECT ANSWER>>Alignment sheets
In area is considered oxygen deficient if the oxygen level is below
___________ % - CORRECT ANSWER>>19.5
During a pressure test, if a leak develops on a connection, yomust
depressurize to a safe level and then - CORRECT ANSWER>>re-tighten the
connections
,Which listed non-destructive testing method is specified in API 1104? -
CORRECT ANSWER>>RT examination
Prior to a hydrotest, ensure that the _______ has approved the de-watering
location. - CORRECT ANSWER>>Environmental Inspector
As an inspector, you should ensure that there is always a (n) on a site with an
open excavation. - CORRECT ANSWER>>designated competent person
Calculate the top width of a bell hole excavation using the following
information: Depth of ditch: 8 feet Bottom Width: feet Soil type: C - CORRECT
ANSWER>>30 : formula soil type C : 3 x depth + bottom width = top width
Demonstrated ability to apply knowledge and skills. - CORRECT
ANSWER>>competence
According to the EPA, which phase covers containment, countermeasures,
cleanup, and disposal for response for oil removal after a spill. - CORRECT
ANSWER>>Phase III
Which refarence in 40 CFR Part 300 claifies procedures for planning and
implementing off-site response actions for hazardous substances? - CORRECT
ANSWER>>300.440
The color code for marking oil & gas buried utilities during sweep is
_____________? - CORRECT ANSWER>>yellow
, According to OSHA, excavations that are less than 5' in depth & the
examination of the ground by a competent person provides no indication of
a potential cave-in, is not required to have any type of protection system. -
CORRECT ANSWER>>True
MOC stands for ____________? - CORRECT ANSWER>>management of
change
Replica tape is used during __________ measurements? - CORRECT
ANSWER>>surface profile
Where can the exact code for strength test requirements be found for
carbon steel (natural gas) pipelines to operate at a hoop stress of 30% or
more of SMYS? - CORRECT ANSWER>>192.505
Title 49, CFR 195: The total number of girth welds and the number
nondestructively tested, including the number rejected and the disposition of
each rejected weld records must be maintained for at least - CORRECT
ANSWER>>5 years
According to Title 49, CFR 192, Subpart N: Records of prior qualification and
records of individuals no longer performing covered tasks shall be retained
for a period of ______________ years. - CORRECT ANSWER>>5
During weld qualification, the fillet weld specimens can be broken inside the
weld by any convenient method. - CORRECT ANSWER>>true