SOS NERC Prep - RElIABILITY Exam with Questions and 100% Correct Answers

Instelling
SOS NERC Prep - RElIABILITY
Vak
SOS NERC Prep - RElIABILITY

Voorbeeld van de inhoud

SOS NERC Prep / RElIABILITY Exam with Questions
and 100% Correct Answers
The Reliability Coordinator just informed you of a slow time error
correction which will begin at the top of the next hour. Your EMS system
will not let you change your scheduled frequency. Your Frequency Bias
Setting is -100 MW/.1Hz. What action should you take?


A) Increase Net Interchange Schedule by 20 MWs.


B) Inform the Reliability Coordinator that you cannot participate in the
time error correction.


C) Decrease Net Interchange Schedule by 20 MWs.


D) Increase Net Interchange Schedule by 10 MWs.
A) Increase Net Interchange Schedule by 20 MWs.




A Balancing Authority has a sudden loss of a large block of load in its
area. This loss will be seen instantaneously in the change of which of the
following values?


1. Actual Net Interchange
2. Scheduled Frequency
3. Scheduled Net Interchange
4. Area Control Error


A) 4 only
B) 1 & 3
C) 1 & 4
D) 3 & 4
C) 1 & 4




Metered Data included in the calculation of ACE are: dynamic schedules,
pseudo ties, actual frequency, and all __________.


A) Tie lines readings
B) Generators output
C) Scheduled frequency indications
D) Transformer load
A) Tie lines readings

, SOS NERC Prep / RElIABILITY Exam with Questions
and 100% Correct Answers


Balancing Authority A is currently reading a system frequency of 60.00 Hz.
Its Net Actual Interchange is +100 MW and its Net Scheduled Interchange is
+200 MW. If Balancing Authority A's frequency bias setting is 100 MW/0.1 Hz,
what is ACE?


A) -100
B) 0
C) 10
D) 100
A) -100




A Balancing Authority has a Net Interchange Schedule of -250 MWs from 1200
to 1600 on a summer day. The Net Interchange Actual for those same hours
respectively were -230 MW, -275 MW, -250 MW and -270 MW. What was the
Balancing Authority's Inadvertent Interchange for the 4-hour period?


A) 6 MWs out
B) 25 MWs in
C) 25 MWs out
D) 6 MWs in
B) 25 MWs in




For the ACE equation to work properly, dynamic schedules, pseudo ties,
frequency, and all ________________ must be metered.


A) Generation
B) Communications
C) Transformers
D) Tie lines
D) Tie lines




If the frequency bias setting is set to a less negative value than the
frequency response of a Balancing Authority and a frequency increase is
caused by a sudden loss of load in an external balancing area, what will be
the result?

, SOS NERC Prep / RElIABILITY Exam with Questions
and 100% Correct Answers

A) The ACE will be zero and will take no AGC action


B) The ACE will be a negative value and AGC will increase generation


C) The ACE will be a positive value and AGC will lower generation


D)This will not affect the ACE
B) The ACE will be a negative value and AGC will increase generation




If the frequency bias setting is less negative than the frequency response
of a Balancing Authority and a frequency decline is caused by a sudden loss
of generation in an external balancing area, what will be the result?


A) The ACE will be a negative value and AGC will increase generation.


B) This will not affect the ACE.


C) The ACE will be a positive value and AGC will lower generation.


D) The ACE will be zero and will take no AGC action.
C) The ACE will be a positive value and AGC will lower generation.




It is the responsibility of which entity/entities to develop, maintain, and
implement load shedding plans?


A) Transmission Operators and Balancing Authorities


B) Reliability Coordinator


C) Load Serving Entities


D) Balancing Authority
A) Transmission Operators and Balancing Authorities

, SOS NERC Prep / RElIABILITY Exam with Questions
and 100% Correct Answers
A Transmission line is loaded 25% above its SOL. A parallel line is out for
routine maintenance and can be placed in service in 10 minutes. What is the
first step the Operator should take to reduce the line loading?


A)Shed load at the downstream bus.


B) Open the line.


C) Re-Dispatch Generation.


D) Initiate the restoration of the parallel line.
D) Initiate the restoration of the parallel line.




As a Transmission Operator, you realize that the voltage level is starting
to decline in the North West part of the system. Which of the following
devices should you, as a Transmission Operator, be able to operate, and/or
have another entity operate to raise the voltage level back to normal in
the North West part of the system?


A) Transformer Underload Tap Changers
B) Shunt Capacitor Banks
C) Generator Reactive Output
D) All answers are correct
D) All answers are correct




Voltage reduction for load relief should be made on the __________.


A) Distribution system
B) Entire Interconnection simultaneously
C) Tie-lines with other Balancing Authority Areas
D) Transmission System
A) Distribution system




Under Frequency Load Shedding (UFLS) is to stabilize the imbalance between
generation and load that has been created by a system disturbance. This is
accomplished by ____________.

Geschreven voor

Instelling
SOS NERC Prep - RElIABILITY
Vak
SOS NERC Prep - RElIABILITY

Documentinformatie

Geüpload op
2 juli 2025
Aantal pagina's
72
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$20.49
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
TESTCHIEF NURSING, ECONOMICS, MATHEMATICS, BIOLOGY, AND HISTORY MATERIALS BEST TUTORING, HOMEWORK HELP, EXAMS, TESTS, AND STUDY GUIDE MATERIALS WITH GUARANTEED A+ I am a dedicated medical practitioner with diverse knowledge in matters
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
77
Lid sinds
2 jaar
Aantal volgers
10
Documenten
1349
Laatst verkocht
1 week geleden
Test success

4.1

10 beoordelingen

5
7
4
0
3
1
2
1
1
1

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen