True/False
According to the NERC Functional Model, there is no difference between
the function and the entity.
A) True
B) False - ANSWER B) False
True/False
Analysis type questions are designed to be the least complex from a
human cognitive process.
A) True
B) False - ANSWER B) False
True/False
A Transmission Service Provider is an entity that both owns and operates
transmission facilities on the Bulk Electric System.
A) True
B) False - ANSWER B) False
True/False
,The NERC Functional Model is designed so that the functions of
Generator Owner and Generator Operator can be performed by two
different entities.
A) True
B) False - ANSWER A) True
The Contingency Event Recovery Period is _______ minutes.
A) 30 mins
B) 60 mins
C) 90 mins
D) 15 mins - ANSWER D) 15
Each Balancing Area or Reserve Sharing Group must review it's
Contingencies on at least a/an __________ basis.
A) Semi Annually
B) Annually
C) Weekly
D) Monthly - ANSWER B) Annually
How many forms of identification are required when taking the NERC
System Operator Certification exam?
A) 4
B) 9
C) 1
D) 2 - ANSWER 2
The NERC came into existence as a result of the Electric Power
Reliability Act of what year?
A) 1958
B) 2005
C) 1967
D) 1997 - ANSWER 1967
, How many certification credentials does NERC have examinations for?
A) 2
B) 4
C) 6
D) 3 - ANSWER 4
There are how many ways to make adjustments for a time error correction?
A) 2
B) 3
C) 5
D) 6 - ANSWER A) 2
Match the acronym with the appropriate organization.
FERC North American Electric Reliability Corp
NERC Florida Reliability Coordinating Council
FRCC Reliability First
RF Federal Energy Regulatory Commission - ANSWER 1. FERC Federal
Energy Regulatory Commission
2. NERC North American Electric Reliability Corporation
3. FRCC Florida Reliability Coordinating Council
4. RF Reliability First
True/False
Balancing Authorities are responsible to ensure that transmission
facilities are operated within the limits that are established by the
Transmission Owners. - ANSWER False
The first power pool in the industry was created in 1927 and was known
as which of the following? - ANSWER Pennsylvania-New Jersey
Interconnection
How many Interconnections are there in North America?