Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

CM 3112 Building Information Modeling EXAM COMPLETE QUESTIONS WITH CORRECT VERIFIED ANSWERS UPDATED 2025/2026 VERSION|| ALREADY GRADED SOLUTIONS FOR A 100% GUARANTEED PASS

Beoordeling
-
Verkocht
-
Pagina's
18
Cijfer
A+
Geüpload op
05-07-2025
Geschreven in
2024/2025

CM 3112 Building Information Modeling EXAM COMPLETE QUESTIONS WITH CORRECT VERIFIED ANSWERS UPDATED 2025/2026 VERSION|| ALREADY GRADED SOLUTIONS FOR A 100% GUARANTEED PASS!!! 1) Defining specific implementation areas and uses for BIM is more important than focusing on whether or not to use BIM in general. - ANSWER True 2) BIM can carry some level of additional process risk due to inexperience and unfamiliarity. - ANSWER True 3) The goal of the NBIMS-US is to identify and define standard information exchanges that are required on facility projects. - ANSWER True 4) Ineffective planning of BIM implementation can result in increased costs for the modeling services, schedule delays due to missing information, and little to no added value. - ANSWER True 5) BIM process design clearly illustrates the execution process through the use of process maps. - ANSWER True 6) Which of the following is an influence of BIM on Industry Problems? 7) Select one: a. Clash Detection b. Better Communication c. Better Planning and Management d. All of the above - ANSWER d. All of the above 8) What is the full form of NBIMS? - ANSWER National Building Information Modeling Standards 9) In BIM, it is not just a model, it is __________. - ANSWER a database 3D 5D 7D 6D 10) 4D - ANSWER 3D - Visualization, 5D - Estimating, 7D - Facility Management, 6D - Sustainability, 4D - Scheduling LOD-300 LOD-100 LOD-500 LOD-400 11) LOD-200 - ANSWER LOD-300 - Cost Estimation: Estimated cost based on measurement of specific assembly, LOD-100 - Scheduling: Total Project Construction duration, LOD-500 - Energy Analysis: Commissioning and recording of measured performance, LOD-400 - Milestones: Constructability and Fabrication, LOD-200 - Preliminary Design: Three dimension-generic elements Fabrication Conceptual Design Documentation Analysis Construction 4D/5D Demolition Programming Detailed Design Operation and Maintenance 12) Construction Logistics - ANSWER The correct answer is: Fabrication - 6 Conceptual Design - 2 Documentation - 5, Analysis - 4 Construction 4D/5D - 7 Demolition - 10 Programming - 1 Detailed Design - 3 Operation and Maintenance - 9 Construction Logistics - 8 13) Which among the following BIM benefits scored the highest percentage according to BIM users? - ANSWER Improved Collective Understanding of Design Intent 14) How many uses of BIM have been identified by the BIM Project Execution Planning guide? - ANSWER 25

Meer zien Lees minder
Instelling
CM 3112
Vak
CM 3112

Voorbeeld van de inhoud

CM 3112 Building Information
Modeling EXAM COMPLETE QUESTIONS
WITH CORRECT VERIFIED ANSWERS
UPDATED 2025/2026 VERSION||
ALREADY GRADED SOLUTIONS FOR A
100% GUARANTEED PASS!!!
1) Defining specific implementation areas and uses for BIM is more
important than focusing on whether or not to use BIM in general. -
ANSWER ✓ True

2) BIM can carry some level of additional process risk due to
inexperience and unfamiliarity. - ANSWER ✓ True

3) The goal of the NBIMS-US is to identify and define standard
information exchanges that are required on facility projects. -
ANSWER ✓ True

4) Ineffective planning of BIM implementation can result in increased
costs for the modeling services, schedule delays due to missing
information, and little to no added value. - ANSWER ✓ True

5) BIM process design clearly illustrates the execution process
through the use of process maps. - ANSWER ✓ True

6) Which of the following is an influence of BIM on Industry
Problems?
7) Select one:
a. Clash Detection
b. Better Communication

, c. Better Planning and Management
d. All of the above - ANSWER ✓ d. All of the above

8) What is the full form of NBIMS? - ANSWER ✓ National Building
Information Modeling Standards

9) In BIM, it is not just a model, it is __________. - ANSWER ✓ a
database

3D

5D

7D

6D

10) 4D - ANSWER ✓ 3D - Visualization,
5D - Estimating,
7D - Facility Management,
6D - Sustainability,
4D - Scheduling

LOD-300

LOD-100

LOD-500

LOD-400

11) LOD-200 - ANSWER ✓ LOD-300 - Cost Estimation:
Estimated cost based on measurement of specific assembly,
LOD-100 - Scheduling: Total Project Construction duration,

, LOD-500 - Energy Analysis: Commissioning and recording of measured
performance,
LOD-400 - Milestones: Constructability and Fabrication, LOD-200 -
Preliminary Design: Three dimension-generic elements

Fabrication

Conceptual Design

Documentation

Analysis

Construction 4D/5D

Demolition

Programming

Detailed Design

Operation and Maintenance

12) Construction Logistics - ANSWER ✓ The correct answer is:
Fabrication - 6
Conceptual Design - 2
Documentation - 5, Analysis - 4
Construction 4D/5D - 7
Demolition - 10
Programming - 1
Detailed Design - 3
Operation and Maintenance - 9
Construction Logistics - 8

Geschreven voor

Instelling
CM 3112
Vak
CM 3112

Documentinformatie

Geüpload op
5 juli 2025
Aantal pagina's
18
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$12.29
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
SmartscoreAaron Chicago State University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
83
Lid sinds
1 jaar
Aantal volgers
6
Documenten
4146
Laatst verkocht
3 dagen geleden
SMARTSCORES LIBRARY

Get top-tier academic support for Psychology, Nursing, Business, Engineering, HRM, Math, and more. Our team of professional tutors delivers high-quality homework, quiz, and exam assistance—ensuring scholarly excellence and grade-boosting results. Trust our collaborative expertise to help you succeed in any course at U.S.A Institutions.

3.1

7 beoordelingen

5
3
4
1
3
0
2
0
1
3

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen