Modeling EXAM COMPLETE QUESTIONS
WITH CORRECT VERIFIED ANSWERS
UPDATED 2025/2026 VERSION||
ALREADY GRADED SOLUTIONS FOR A
100% GUARANTEED PASS!!!
1) Defining specific implementation areas and uses for BIM is more
important than focusing on whether or not to use BIM in general. -
ANSWER ✓ True
2) BIM can carry some level of additional process risk due to
inexperience and unfamiliarity. - ANSWER ✓ True
3) The goal of the NBIMS-US is to identify and define standard
information exchanges that are required on facility projects. -
ANSWER ✓ True
4) Ineffective planning of BIM implementation can result in increased
costs for the modeling services, schedule delays due to missing
information, and little to no added value. - ANSWER ✓ True
5) BIM process design clearly illustrates the execution process
through the use of process maps. - ANSWER ✓ True
6) Which of the following is an influence of BIM on Industry
Problems?
7) Select one:
a. Clash Detection
b. Better Communication
, c. Better Planning and Management
d. All of the above - ANSWER ✓ d. All of the above
8) What is the full form of NBIMS? - ANSWER ✓ National Building
Information Modeling Standards
9) In BIM, it is not just a model, it is __________. - ANSWER ✓ a
database
3D
5D
7D
6D
10) 4D - ANSWER ✓ 3D - Visualization,
5D - Estimating,
7D - Facility Management,
6D - Sustainability,
4D - Scheduling
LOD-300
LOD-100
LOD-500
LOD-400
11) LOD-200 - ANSWER ✓ LOD-300 - Cost Estimation:
Estimated cost based on measurement of specific assembly,
LOD-100 - Scheduling: Total Project Construction duration,
, LOD-500 - Energy Analysis: Commissioning and recording of measured
performance,
LOD-400 - Milestones: Constructability and Fabrication, LOD-200 -
Preliminary Design: Three dimension-generic elements
Fabrication
Conceptual Design
Documentation
Analysis
Construction 4D/5D
Demolition
Programming
Detailed Design
Operation and Maintenance
12) Construction Logistics - ANSWER ✓ The correct answer is:
Fabrication - 6
Conceptual Design - 2
Documentation - 5, Analysis - 4
Construction 4D/5D - 7
Demolition - 10
Programming - 1
Detailed Design - 3
Operation and Maintenance - 9
Construction Logistics - 8