Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

CM 3112 BIM EXAM COMPLETE QUESTIONS WITH CORRECT VERIFIED ANSWERS UPDATED 2025/2026 VERSION|| ALREADY GRADED SOLUTIONS FOR A 100% GUARANTEED PASS

Beoordeling
-
Verkocht
-
Pagina's
3
Cijfer
A+
Geüpload op
05-07-2025
Geschreven in
2024/2025

CM 3112 BIM EXAM COMPLETE QUESTIONS WITH CORRECT VERIFIED ANSWERS UPDATED 2025/2026 VERSION|| ALREADY GRADED SOLUTIONS FOR A 100% GUARANTEED PASS!!! 1. What is the full form of NBIMS? - ANSWER National Building Information Modeling Standards 2. CAD cannot automate and accelerate the drafting process. - ANSWER false 3. The BIM plan is not meant to help the organizations to understand their roles and responsibilities in the implementation - ANSWER false 4. On most projects, one meeting is enough to develop the overall BIM plan. - ANSWER false 5. Visual validation for payment approval cannot be performed using 4D scheduling model in BIM. - ANSWER - 6. At the end of the planning phase, valuable information can be used by the facility operator for asset management, space planning, and maintenance scheduling to improve the overall performance of the facility or a portfolio of facilities. - ANSWER False 7. ____ can facilitate automated building checking. - ANSWER BIM 8. Defining specific implementation areas and uses for BIM is more important than focusing on whether or not to use BIM in general. - ANSWER True 9. 5D cost model in BIM can be used for value engineering. - ANSWER - 10. BIM is a non-parametric 3D model that helps document the design of a building. - ANSWER True 11. How many uses of BIM have been identified by the BIM Project Execution Planning guide? - ANSWER 25 12. Drawings or plans in CAD consist mainly of ____, ____, and ____. - ANSWER lines, circles, arcs 13. Ineffective planning of BIM implementation can result in increased costs for the modeling services, schedule delays due to missing information, and little to no added value. - ANSWER True 14. Project phasing simulations can be performed using 3D visualization model in BIM. - ANSWER - 15. BIM process design clearly illustrated the execution process through the use of process maps. - ANSWER True 16. The Project Manager always develops the BIM Plan. - ANSWER False 17. During the BIM execution process, a low-level map is initially developed to help team members clearly understand how their work processes interact with the processes performed by other team members. - ANSWER False 18. The goal of the NBIMS-US is to identify and define standard information exchanges that are required on facility projects. - ANSWER True

Meer zien Lees minder
Instelling
CM 3112
Vak
CM 3112

Voorbeeld van de inhoud

CM 3112 BIM EXAM COMPLETE
QUESTIONS WITH CORRECT
VERIFIED ANSWERS UPDATED
2025/2026 VERSION|| ALREADY
GRADED SOLUTIONS FOR A 100%
GUARANTEED PASS!!!

1. What is the full form of NBIMS? - ANSWER ✓ National Building
Information Modeling Standards

2. CAD cannot automate and accelerate the drafting process. -
ANSWER ✓ false

3. The BIM plan is not meant to help the organizations to understand
their roles and responsibilities in the implementation - ANSWER ✓
false

4. On most projects, one meeting is enough to develop the overall BIM
plan. - ANSWER ✓ false

5. Visual validation for payment approval cannot be performed using 4D
scheduling model in BIM. - ANSWER ✓ -

6. At the end of the planning phase, valuable information can be used
by the facility operator for asset management, space planning, and
maintenance scheduling to improve the overall performance of the
facility or a portfolio of facilities. - ANSWER ✓ False

7. ____ can facilitate automated building checking. - ANSWER ✓ BIM

Geschreven voor

Instelling
CM 3112
Vak
CM 3112

Documentinformatie

Geüpload op
5 juli 2025
Aantal pagina's
3
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$12.59
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
SmartscoreAaron Chicago State University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
83
Lid sinds
1 jaar
Aantal volgers
6
Documenten
4146
Laatst verkocht
3 dagen geleden
SMARTSCORES LIBRARY

Get top-tier academic support for Psychology, Nursing, Business, Engineering, HRM, Math, and more. Our team of professional tutors delivers high-quality homework, quiz, and exam assistance—ensuring scholarly excellence and grade-boosting results. Trust our collaborative expertise to help you succeed in any course at U.S.A Institutions.

3.1

7 beoordelingen

5
3
4
1
3
0
2
0
1
3

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen