1. The owner must prove financial capability no later than ________
days prior to the expiration of the time for withdrawal of bids. A. 3
B. 5 C.7 D.30 - ANSWER ✔ Answer: C. 7 - AIA 701.6.2
2. Which of the following is a first aid treatment not to be recorded
on an OSHA # 200 log? A. administering a tetanus immunization
B. administering a rabies immunization C. application of bandages
or a butterfly dressing in lieu of sutures. D. a minor accident
involving a loss of consciousness. - ANSWER ✔ Answer: A.
Administering a tetanus immunization - CM 7-24
3. Which of the following is NOT true about corporations? A. With
an "S" corporation there is no corporate tax - you pay taxes
individual. B. Closely held corporations operate more informally.
C. There is no limit of shareholders for either a C-type or S-type
Corpo. D. C-type corpo have the possibility of double taxation. -
ANSWER ✔ Answer: C There is no limit of shareholders - CM 1-
13
,4. What is the term for expenses that are actually paid but not
recognized as paid until a later period? A. post paid costs B.
deferred assets C. accrued expenses D. long-term liabilities -
ANSWER ✔ Answer: B. deferred assets - BGA 242
5. How many copies of the plans and specifications shall the
contractor maintain on site? A. 1 B. 2 C. 3 D. 4 - ANSWER ✔
Answer: A. 1 - AIA201 2.3.6
6. Contracts entered into by unlicensed contractors
________________. A. are immoral B.are illegal C. are
enforceable D. are unenforceable - ANSWER ✔ Answer: D. are
unenforceable - CM 2-94 489.128
7. The subcontractor agrees that all work shall be done subject to the
final approval of the ______________________. A. architect B.
contractor C. both A & B are correct D. none of the above -
ANSWER ✔ Answer: C. A & B are correct - AIA 401.4.2.5
8. Which of the following is NOT exempt from chapter 489? A. An
employee of a licensee who is subordinate of a construction
licensee acting within the scope. B. Owners of a property with a
cost of $85,000. C. Contractors in work on bridges and roads. D.
Anybody doing work of a minor nature - less $1,000 or less. -
, ANSWER ✔ Answer B. Owners of property $85,000 - CM 2-63
489.103 Limit is $75,000.
9. The architect has the sole responsibility for ordering
__________________. A. Change orders B. Construction change
directives C. any minor change of work D. any changes
whatsoever - ANSWER ✔ Answer: C. any minor change in work -
AIA 201 7.1.2
10. When considering the location of your office, which of the
following is not a consideration? A. Zoning Ordinances B.
Demographic makeup of community C. Building Permits D. Flood
Prone Area Maps - ANSWER ✔ Answer: B. Demographic Makeup
- CM 1-15
11. The bonding cost for a class "B" contract of $900,000 will
cost ________________. A. $9,000 B. $10,000 C. $12,500 D.
$22,500 - ANSWER ✔ Answer: C. $12,500 CM 4-18 Graduated
scale: 1st- 100x25%+ 2,500 2nd 400 x15%+ 6,000 3rd 400x
10%=4,000 Total $12,500
12. A project is to be considered abandoned after _________
days if the contractor just terminates the project without
notification to the owner and without cause. A. 30 B. 60 C. 45 D.
90 - ANSWER ✔ Answer D. 90 - CM 2-96 , 489.129.1.j