WITH 100% CORRECT ANSWERS!!
1 of 54
Term
Shut Down TWT(Travelling wave tube) HPA
Shut Down FLV BDE
Tag out primary circuit breaker
Give this one a try later!
7 Steps in powering "ON" the Power
Steps to power down FLV ADE
Conditioner.
, Power OFF Power conditioner steps. Steps to activate HPA RF Power
Don't know?
2 of 54
Definition
7.25 and 7.75GHz
Give this one a try later!
X-Band K-band
A-band L-band
Don't know?
3 of 54
Definition
Used to split and amplify a signal while preserving and
improving the inputs signal.
Give this one a try later!
Distribution Amplifiers The Feed Assembly
, X-Band Antenna Control Window
Don't know?
4 of 54
Definition
RF/IF Switch sends this duplexed signal to the BUC located in the
ADE. THis is the end of the TX Path.
Give this one a try later!
Mode BD(Below Deck)
Indicator displays ready
TRX/RCV(END OF TRX)
SATL SUB-points file and Satellite.txt Online Equipment window
Don't know?
5 of 54
Definition
To receive and route signals.
Give this one a try later!
, Purpose of CBSP Baseband Role of signal encryption in
equipment communications
Function of Satellite Dish installation Objective of Data Storage systems
Don't know?
6 of 54
Definition
Must be in place before ULV is powered on.
Give this one a try later!
SAR SAA
SIA SCU
Don't know?
7 of 54
Definition
1. Multiple frequency ranges.
2.Compensation for ship motion
3.geostationary orbit