QSP Exam Study GUIDE ACTUAL EXAM 2025/2026 EXAM QUESTIONS WITH CORRECT VERIFIED SOLUTIONS || 100% GUARANTEED PASS BRAND NEW VERSION 1. When does the CGP apply? - ANSWER Any construction or demolition of one acre or more 2. Activities under the CGP include: a. Routine maintenance to maintain original line and grade, hydraulic capacity, or original purpose of the facility. b. Disturbances to land surfaces solely related to agricultural operations. c. Clearing and grading 2 acres of land d. Discharges of storm water from areas on tribal lands. - ANSWER C 3. TRUE OR FALSE: if construction of an LUP will occur across several properties, the utility company, municipality, or other public/private company/agency that owns or operates the LUP project is responsible for obtaining coverage - ANSWER True 4. Risk Level 2 monitoring requirements include: a. Effluent sampling where applicable b. Sampling for pH and turbidity c. Sampling for pH, turbidity, and suspended sediments - ANSWER B 5. All NAL data must be uploaded within ___ after NAL exceedance has been identified a. 24 hours b. 1 week c. 10 days d. 2 weeks - ANSWER C 6. Who must file Permit Registration Documents (PRDs) prior to the commencement of construction activity? a. Qualified SWPPP Developer (QSD) b. Legally Responsible Person (LRP) or the LRP's Approved Signatory c. Qualified SWPPP Practitioner (QSP) d. The CEO - ANSWER B 7. Which regulation establishes a framework for regulating municipal and industrial storm water discharges to waters of the United States: a. Clean Water Act (CWA) b. Porter-Cologne Water Quality Control Act c. Endangered Species Act d. U.S. Environmental Protection Agency (USEPA) e. California Environmental Quality Act (CEQA) - ANSWER A 8. Certain non-storm water discharges may be necessary for the completion of construction projects. Therefore the General Permit authorizes such discharges provided they meet the following conditions except: a. Meet the NALs for pH and turbidity b. Not cause or contribute to a violation of water quality standards c. Comply with BMPs as described in the SWPPP d. Be infeasible to eliminate e. Causes or threatens to cause pollution, contamination, or nuisance - ANSWER E 9. When possible, use erosion controls as the ___ protection, with sediment controls as a ___system. a. primary, secondary b. secondary, primary - ANSWER A 10. A temporary or permanent structural BMP that directs concentrated flows away from disturbed areas and prevents erosion is... a. erosion control b. run on/ run off control c. sediment control - ANSWER B 11. The amount of eroded soil that settles out at a point in the watershed that is remote from the origin of the detached soil particles is... a. Rainfall Erosivity Factor b. Slope Length and Steepness Factors c. Soil Cover Factor d. Sediment Yield - ANSWER D 12. What is turbidity? a. The degree to which the water loses its transparency due to the presence of suspended particulates b. the acidity or alkalinity of a solution c. the degree to which a chemical substance or a particular mixture of substances can damage an organism - ANSWER A 13. The removal of a uniform thin layer of soil by raindrop splash or water run-off is... a. Splash Erosion b. Rill Erosion c. Sheet Erosion d. Wind Erosion - ANSWER C 14. What elements of RUSLE are independent of location? a. K b. R c. LS d. C & P - ANSWER D 15. What does the "P" stand for in the Revised Universal Soil Loss Equation (RUSLE)? a. Soil erodibility factor b. Management operations and support practices (sediment controls) c. Rainfall-runoff erosivity factor d. Length-slope factor e. Cover factor (erosion controls) - ANSWER B 16. What is the difference of an LUP project in comparison to traditional projects? a. Erosion control is not needed. b. "Run-On/Run-Off" is not an objective. c. Sampling is not required. - ANSWER B 17. TRUE OR FALSE: The SWPPP is a "living document" that is amended/updated to reflect conditions & reduce pollutants - ANSWER True 18. Stockpiles require a linear sediment barrier at all times, and must be covered prior to a rain event or when inactive. A stockpile is inactive after __days of inactivity. a. 3 b. 7 c. 10 d. 14 - ANSWER D 19. Once identified, dischargers shall begin implementing repairs or design changes to BMPs: a. Immediately b. Within24 hours c. Within48 hours d. ASAP, but not more than 72 hours - ANSWER D 20. The discharger shall ensure a QSP develop a Rain Event Action Plan (REAP) __ hours prior to any likely precipitation event. a. Immediately b. 24 hours c. 48 hours d. ASAP but not more than 72 hours - ANSWER C 21. A likely precipitation event is any weather pattern that is forecasted to have a __% or greater probability of producing precipitation in the project area. a. 10 b. 25 c. 50 d. 75 e. 99 - ANSWER C 22. TRUE OR FALSE: At Risk Level 2 & 3 sites, receiving water monitoring is required if the receiving water monitoring trigger exceeded pH, turbidity and SSC. Bioassessment for sites 30 acres or larger. - ANSWER False (Risk level 3 only) 23. Visual monitoring is required for non-storm water, pre-rain and post-rain at what Risk Levels? a. Risk Level 1 b. Risk Level 2 c. Risk Level 3 d. All of the above e. Risk Level 1 & 2 - ANSWER D 24. A storm that produces ½ inch or more of precipitation, with a 48 hour or greater period between rain events is a/an... a. Qualifying rain event b. Extended storm event c. Inactive storm event d. Unsafe monitoring event - ANSWER A 25. Upload photos to SMARTS that are taken during daily inspections of the LUP site before, during, and after every ___ storm event a. First b. Second c. Third d. Fourth - ANSWER C 26. Which statement is false? Monitoring is not required when: a. the site/sampling locations are unsafe to access due to the storm event b. it is outside of scheduled site operation hours c. the contractor elects not to work and the site is "shut down" for a rainy day - ANSWER C 27. A likely precipitation event is any weather pattern that is forecasted to have a ____% or greater probability of producing precipitation in the project area. a. 10 b. 25 c. 50 d. 75 e. 99 - ANSWER C 28. A QSP is responsible for: a. Day to day implementation, inspections, and observations b. Amending the SWPPP as required c. Developing and certifying the SWPPP d. Certifying reports in SMARTS - ANSWER a. Day to day implementation, inspections, and observations 29. A storm that produces ½ inch or more of precipitation, with a 48 hour or greater period between rain events is a/an... a. Qualifying rain event b. Extended storm event c. Inactive storm event d. Unsafe monitoring event - ANSWER a. Qualifying rain event 30. A temporary or permanent structural BMP that directs concentrated flows away from disturbed areas and prevents erosion is... a. erosion control b. run on/ run off control c. sediment control - ANSWER b. run on/ run off control 31. Acceptable methods to demonstrate final stabilization include: a. 50%vegetative coverage b. 100% vegetative coverage c. RUSLE 2 method - ANSWER c. RUSLE 2 method

Show more Read less
Institution
QSP - Qualified SWPPP Practitioner
Course
QSP - Qualified SWPPP Practitioner

Content preview

QSP Exam Study GUIDE ACTUAL
EXAM 2025/2026 EXAM QUESTIONS
WITH CORRECT VERIFIED SOLUTIONS
|| 100% GUARANTEED PASS <BRAND
NEW VERSION>

1. When does the CGP apply? - ANSWER ✓ Any construction or
demolition of one acre or more

2. Activities under the CGP include:
a. Routine maintenance to maintain original line and grade,
hydraulic capacity, or original purpose of the facility.
b. Disturbances to land surfaces solely related to agricultural
operations.
c. Clearing and grading 2 acres of land
d. Discharges of storm water from areas on tribal lands. -
ANSWER ✓ C

3. TRUE OR FALSE: if construction of an LUP will occur across
several properties, the utility company, municipality, or other
public/private company/agency that owns or operates the LUP
project is responsible for obtaining coverage - ANSWER ✓ True

4. Risk Level 2 monitoring requirements include:
a. Effluent sampling where applicable
b. Sampling for pH and turbidity
c. Sampling for pH, turbidity, and suspended sediments -
ANSWER ✓ B

,5. All NAL data must be uploaded within ___ after NAL exceedance
has been identified
a. 24 hours
b. 1 week
c. 10 days
d. 2 weeks - ANSWER ✓ C

6. Who must file Permit Registration Documents (PRDs) prior to the
commencement of construction activity?
a. Qualified SWPPP Developer (QSD)
b. Legally Responsible Person (LRP) or the LRP's Approved
Signatory
c. Qualified SWPPP Practitioner (QSP)
d. The CEO - ANSWER ✓ B

7. Which regulation establishes a framework for regulating municipal
and industrial storm water discharges to waters of the United
States:
a. Clean Water Act (CWA)
b. Porter-Cologne Water Quality Control Act
c. Endangered Species Act
d. U.S. Environmental Protection Agency (USEPA)
e. California Environmental Quality Act (CEQA) - ANSWER
✓A

8. Certain non-storm water discharges may be necessary for the
completion of construction projects. Therefore the General Permit
authorizes such discharges provided they meet the following
conditions except:
a. Meet the NALs for pH and turbidity
b. Not cause or contribute to a violation of water quality
standards
c. Comply with BMPs as described in the SWPPP
d. Be infeasible to eliminate

, e. Causes or threatens to cause pollution, contamination, or
nuisance - ANSWER ✓ E

9. When possible, use erosion controls as the ___ protection, with
sediment controls as a ___system.
a. primary, secondary
b. secondary, primary - ANSWER ✓ A

10. A temporary or permanent structural BMP that directs
concentrated flows away from disturbed areas and prevents erosion
is...
a. erosion control
b. run on/ run off control
c. sediment control - ANSWER ✓ B

11. The amount of eroded soil that settles out at a point in the
watershed that is remote from the origin of the detached soil
particles is...
a. Rainfall Erosivity Factor
b. Slope Length and Steepness Factors
c. Soil Cover Factor
d. Sediment Yield - ANSWER ✓ D

12. What is turbidity?
a. The degree to which the water loses its transparency due to
the presence of suspended particulates
b. the acidity or alkalinity of a solution
c. the degree to which a chemical substance or a particular
mixture of substances can damage an organism - ANSWER
✓A

13. The removal of a uniform thin layer of soil by raindrop
splash or water run-off is...
a. Splash Erosion

, b. Rill Erosion
c. Sheet Erosion
d. Wind Erosion - ANSWER ✓ C

14. What elements of RUSLE are independent of location?
a. K
b. R
c. LS
d. C & P - ANSWER ✓ D

15. What does the "P" stand for in the Revised Universal Soil
Loss Equation (RUSLE)?
a. Soil erodibility factor
b. Management operations and support practices (sediment
controls)
c. Rainfall-runoff erosivity factor
d. Length-slope factor
e. Cover factor (erosion controls) - ANSWER ✓ B

16. What is the difference of an LUP project in comparison to
traditional projects?
a. Erosion control is not needed.
b. "Run-On/Run-Off" is not an objective.
c. Sampling is not required. - ANSWER ✓ B

17. TRUE OR FALSE: The SWPPP is a "living document" that
is amended/updated to reflect conditions & reduce pollutants -
ANSWER ✓ True

18. Stockpiles require a linear sediment barrier at all times, and
must be covered prior to a rain event or when inactive. A stockpile
is inactive after __days of inactivity.
a. 3
b. 7

Written for

Institution
QSP - Qualified SWPPP Practitioner
Course
QSP - Qualified SWPPP Practitioner

Document information

Uploaded on
July 19, 2025
Number of pages
35
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$14.39
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF


Also available in package deal

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
SmartscoreAaron Chicago State University
Follow You need to be logged in order to follow users or courses
Sold
79
Member since
1 year
Number of followers
6
Documents
4141
Last sold
2 weeks ago
SMARTSCORES LIBRARY

Get top-tier academic support for Psychology, Nursing, Business, Engineering, HRM, Math, and more. Our team of professional tutors delivers high-quality homework, quiz, and exam assistance—ensuring scholarly excellence and grade-boosting results. Trust our collaborative expertise to help you succeed in any course at U.S.A Institutions.

3.1

7 reviews

5
3
4
1
3
0
2
0
1
3

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions