Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

CDS EXAM 1UPDATED QUESTIONS AND ANSWERS

Beoordeling
-
Verkocht
-
Pagina's
10
Cijfer
A+
Geüpload op
20-07-2025
Geschreven in
2024/2025

CDS EXAM 1UPDATED QUESTIONS AND ANSWERS Labor and material payment bonds provide the necessary protection on public projects - CORRECT ANSWERTRUE

Instelling
CDS
Vak
CDS

Voorbeeld van de inhoud

CDS EXAM 1UPDATED QUESTIONS AND ANSWERS
Labor and material payment bonds provide the necessary protection on public projects - CORRECT
ANSWER✅✅TRUE



Miller act corresponds with what.? - CORRECT ANSWER✅✅Labor and material payment bond



Architects should not advise owners and the legal sufficiency of required affidavits, waivers, or releases
of liens. - CORRECT ANSWER✅✅TRUE



Liens are not permitted on public projects. - CORRECT ANSWER✅✅TRUE



Architect must review, approve, and promptly submit shop drawings required by the contract
documents. - CORRECT ANSWER✅✅TRUE



An architect approved shop drawings which deviated from the contract documents. - CORRECT
ANSWER✅✅Changes in contract drawings must be submitted in writing to architect before becoming
affective, not equal to revisions within shop drawings.



Who is responsible for errors and omissions in shop drawings? - CORRECT ANSWER✅✅General
Contractor



Revisions not requested by the architect on resubmitted shop drawings don't require architect's
approval? - CORRECT ANSWER✅✅FALSE



A contractors stamp of approval on shop drawings means that the contractor has already determined all
criteria related thereto. - CORRECT ANSWER✅✅FALSE



AIA document B101 is used to outline the architects service obligations? - CORRECT ANSWER✅✅TRUE



The architects responsibilities are re-stated within the AIA General Conditions Doc A201. - CORRECT
ANSWER✅✅TRUE

, Contractors may not know what services the architect is obligated to perform if what document is not
part of the contract documents. - CORRECT ANSWER✅✅AIA Document B101



In review of shop drawings the general conditions Document A201 clearly states? - CORRECT
ANSWER✅✅Matters outside the scope of the design concept and the contract documents are not
reviewed.



If an architect had performed their services using stipulations of AIA documents A201 & B141 within a
______ there should be no concern about professional liability. But general liability is different. -
CORRECT ANSWER✅✅Standard of care



Calendar days - CORRECT ANSWER✅✅7 / Week



Liquidated damages is a provision included in the? - CORRECT ANSWER✅✅Owner-contractor
agreement. Document A101.



An amount of money stipulated in the contract that is chargeable against the contractor is
reimbursement for damages suffered by the owner because the contractors failure to fulfill his or her
contractual obligation's. - CORRECT ANSWER✅✅Liquidated damages



What clause should be used when a slight delay in schedule can cause a breach of contract? - CORRECT
ANSWER✅✅Time is of the essence



CPM is superior to a Bar Chart because it shows durations, sequences and relationships to other
activities. - CORRECT ANSWER✅✅TRUE



And small projects what type of progress schedule should be used? - CORRECT ANSWER✅✅Bar chart



And larger complex projects what type of progress schedule should be used? - CORRECT
ANSWER✅✅Critical path method CPM

Geschreven voor

Instelling
CDS
Vak
CDS

Documentinformatie

Geüpload op
20 juli 2025
Aantal pagina's
10
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$11.99
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
STANGRADES Stanford University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
87
Lid sinds
1 jaar
Aantal volgers
1
Documenten
11735
Laatst verkocht
2 dagen geleden
STAN-GRADES

EXCELLENCY IN ACADEMIC MATERIALS

3.4

14 beoordelingen

5
6
4
1
3
3
2
1
1
3

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen