STUDY TEST GUIDE LATEST UPDATE
A fill line in an oil burner system is a line used to: - ANSFill the storage tank with oil.
The aquastat is located - ANSBelow the water line.
All heating, combustion, and cooking equipment shall be installed with adequate clearances
from _______ construction. - ANSCombustible
The equipment must be provided with ______ or the building construction shall be _____
_____. - ANSInsulation.
Fire Protected
During operation the surface of combustible construction materials will not be raised to a temp
higher than _____ degrees F. - ANS170 degrees
Equipment shall be so that the means of access for ordinary operation and maintenance will not
be _______. - ANSHazardous
Acceptance Tests:
Boilers shall not be placed in operation until they have been _____ and ____ and an equipment
____ _____ has been issued by the ______. - ANSInspected and tested.
Use permit, commissioner
Periodic Inspections: All boilers must be inspected at least _____ a _____ including chimney
connections. - ANSOnce a year
Owners Annual Statement: The owner of each boiler shall file an _____ written statement with
the ________, specifying the _____of each boiler and ______ for inspection. - ANSAnnual,
commissioner, location, arrangement.
Field Tests: all piping and oil storage tanks shall be _______ tested for tightness by the ______
before the system is operated. - ANSHydrostatically, contractor
The piping shall be tested at _____ times the max working pressure applicable to that part of
the piping system but at a pressure ____ than the test pressure required for the storage tank. -
ANS1/2, less
, The min pressure for testing tanks shall be ____ times the max working pressure but in no case
less than ____ psi. - ANS1 1/2, 25 psi
The hydrostatic pressure must be maintained until all ____ and _____ have been visually
inspected for ___, but in no case less than _____ hour. - ANSJoints, connections, leaks, 1/2
hour.
A record must be kept of the pressure test showing the name of the _____ and the _____ at
which the piping and tank were tested. - ANSContractor, pressure
Gas piping must be tested by the _____ before operation. - ANSContractor
For oil burning systems, ____ ____ giving instructions for the care and operation of the system
shall be permanently located in an easily _____ and _____ location near the equipment. -
ANSInstruction Cards, visible, accessible
No oil burning equipment shall be operated until an equipment ____ _____ has been issued by
the commissioner, the requirements of the ____ ____ control code have been met and until the
approval for the storage of ____ ____ has been given by the fire commissioner. - ANSUse
permit, air pollution, fuel oil
Every oil burning installation that is not fully automatic or requires preheating shall be operated
under the direct supervision of a person holding a ____ ___ ______ issued by the FD. -
ANSCOF
Such person must be in the building at ____ ____ while in operation and present in the _____
_____ during startup. - ANSAll times, boiler room
After any repairs to the boiler are made, ______ shall check the repairs and the functioning of
all ____ _____ and the positioning of the ______. - ANSOperators, control devices, valves
All heating and combustion equipment that is fired with solid, liquid, or gas fuels, must comply
with the requirements of the ____ _____ _____ code. - ANSAir pollution control
Low Temp Equipment have a temp of ____ degrees at the point of leaving the equipment. -
ANS600 or less
Median Temp Equipment have a temp of between ___ and ___ degrees F at the point of leaving
the equipment under normal conditions. - ANS600 and 1000
High Temp Equipment have a temp of ____ or ____ degrees F leaving the equipment. -
ANS1000 or greater