Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

University of Maryland Global Campus (UMGC): IFSM 300- week 7 quiz|100% answered correctly_updated 2025.

Beoordeling
-
Verkocht
-
Pagina's
6
Cijfer
A+
Geüpload op
26-07-2025
Geschreven in
2024/2025

University of Maryland Global Campus (UMGC): IFSM 300- week 7 quiz|100% answered correctly_updated 2025. Week 7 quiz Question 1 (1 point) Which of the following are the three main variables to be balanced in project management? Question 1 options: time, cost, and scope vision, mission, and strategic objectives deliverables, milestones, and results vacation schedules, project deadlines, and holidays Question 2 (1 point) Failure to properly manage the scope of a project can result in: Question 2 options: completing the project on time completing the project within budget scope creep exceeding quality expectations Question 3 (1 point) A project plan should be (select all that apply) Question 3 options: communicated to all stakeholdersdeveloped with contributions from the project team members consistent in terms of level of detail regardless of project size or complexity presented in clear, commonly understood terms. Question 4 (1 point) True or false: Change management is an unstructured process to reduce the impact of changes to a project. Question 4 options: True False Question 5 (1 point) Which of the following frequently cause projects to fail? Question 5 options: project scope creep failure to manage expectations all of these factors inadequate scheduling Question 6 (1 point) True or false: The role of a project manager includes responsibility for planning, managing, and controlling a project. Question 6 options:True False Question 7 (1 point) SMART criteria for a project plan include objectives that are: Question 7 options: simple, measurable, agreed upon, realistic, and time-framed specific, measurable, aligned, realistic, and time-framed specific, measurable, agreed upon, realistic, and time-framed. simple, meaningful, agreed upon, rule-based, and timely Question 8 (1 point) True or false: A project plan outlines very basic activities for a project. Question 8 options: True False Question 9 (1 point) Match the definition with the appropriate term. Question 9 options: 3 Specific dates by which critical aspects of the project must be completed. 2 Actual products to be delivered as a result of the project. 4 Risk management strategy to 1 Project Scope . 2 Project Deliverable . 3 Project Milestonesplan for unattended issues during a project 1 Description of work to be completed for the project. . 4 Project Contingency . Question 10 (1 point) True or false: During a project, no trade offs may be made to accommodate changes. Question 10 options: True False Question 11 (1 point) The term project scope refers to which of the following? Question 11 options: the strategic business objective the final result of the project key deliverables in the project plan work required to complete the project Question 12 (1 point) Which of the following are correct statements related to project initiation? (Select all that apply) Question 12 options: Project manager identifies strategic IT project. A business case identifying the need is presented to senior managementThe technology solution drives the business strategy. Viability of the project is assessed via a feasibility study. Question 13 (1 point) Which of the following explains why a structured project change management approach is important in project management? Question 13 options: it guarantees the project is completed on time it minimizes scope creep it allows projects to be adjusted continously it guarantees the project is completed within budget Question 14 (1 point) Which of the following is an important competency for project managers? Question 14 options: program development skills charisma complacency problem-solving skills Question 15 (1 point) The following are the three variables often referred to as the Triple Constraints of project management. Question 15 options: quality, time, costquality, time, scope cost, quality, time scope, time, cost

Meer zien Lees minder
Instelling
Vak

Voorbeeld van de inhoud

Week 7 quiz

Question 1 (1 point)



Which of the following are the three main variables to be balanced in
project management?

Question 1 options:

time, cost, and scope

vision, mission, and strategic objectives


deliverables, milestones, and results


vacation schedules, project deadlines, and holidays

Question 2 (1 point)



Failure to properly manage the scope of a project can result in:

Question 2 options:

completing the project on time

completing the project within budget

scope creep

exceeding quality expectations

Question 3 (1 point)



A project plan should be (select all that apply)

Question 3 options:

communicated to all stakeholders

, developed with contributions from the project team members

consistent in terms of level of detail regardless of project size or complexity

presented in clear, commonly understood terms.

Question 4 (1 point)



True or false: Change management is an unstructured process to reduce
the impact of changes to a project.

Question 4 options:

True

False

Question 5 (1 point)



Which of the following frequently cause projects to fail?

Question 5 options:

project scope creep



failure to manage expectations



all of these factors

inadequate scheduling

Question 6 (1 point)



True or false: The role of a project manager includes responsibility for
planning, managing, and controlling a project.

Question 6 options:

Geschreven voor

Instelling
Vak

Documentinformatie

Geüpload op
26 juli 2025
Aantal pagina's
6
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$15.84
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper
Seller avatar
Empire25

Ook beschikbaar in voordeelbundel

Maak kennis met de verkoper

Seller avatar
Empire25 Azusa Pacific University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
-
Lid sinds
2 jaar
Aantal volgers
0
Documenten
89
Laatst verkocht
-
COLLEGE EDUCATOR

I offer course materials, learning platforms, and resources catered to your subject area.

0.0

0 beoordelingen

5
0
4
0
3
0
2
0
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen